Specify a metal-oxide varistor against three separate questions: what voltage remains across it during normal operation, what transient it must absorb, and what the assembly does if the protection branch overheats or disconnects. A matching disk diameter, nominal varistor voltage or energy number does not answer all three. Obtain the exact component identity and a documented acceptance decision for the complete protection branch.
This guide concerns a MOV incorporated into an electrical assembly. It explains how a buyer can organize component evidence, supplier exceptions and acceptance records without inventing a circuit rating. A component datasheet is one input to the engineer's assessment; it is not a test report for the assembled product.
The TVS diode waveform guide addresses a different suppressor technology. The PV surge protective device guide addresses finished-device selection and protection modes. Neither is a substitute for checking a proposed MOV and thermal-disconnection arrangement. Keep the requested deliverable clear: a loose component, a populated protection board, or a complete replaceable assembly.
Write the operating envelope before requesting an equivalent
Begin with a circuit drawing that identifies both nodes connected to the MOV. Naming a battery voltage is insufficient if the component is actually connected across a charger output, a switched inductive load or a converter input. Assign those nodes stable drawing references so supplier questions and subsequent reports refer to the same electrical interface.
Separate the intended operating range from abnormal conditions. The first group includes the specified supply tolerance and any operating modes that remain permissible. The second contains events such as a regulator fault or an incorrectly connected source, if these are part of the project's defined fault review. Procurement should ask the responsible engineer to classify uncertain conditions instead of silently treating every overvoltage as a short surge.
Record the ambient range at the component location and the planned enclosure arrangement. An outdoor ambient figure does not necessarily describe a small board near another dissipating component. Require the supplier to state which temperature is used in each rating or report. Avoid combining a maximum rating at one temperature with a favorable characteristic measured at another as if they were a single tested condition.
A practical RFQ opening contains the drawing revision, normal voltage envelope, relevant abnormal supply states, defined transient duty and required condition after an event. If any item is unknown, mark it as unresolved. This lets suppliers quote an engineering sample or a conditional proposal without presenting the offer as an approved production replacement.
For a sourced protection board, also identify who owns the schematic and who may approve substitutions. A purchasing specification should not accidentally delegate authority to replace a MOV, thermal element or fuse merely because the replacement has a similar commercial description.
Keep continuous voltage, varistor voltage and clamping separate
A MOV specification can contain several voltage numbers for different purposes. Keep the manufacturer's symbols, test current and waveform beside the values when transcribing them into a comparison sheet. Removing those conditions can make an accurate number misleading.
The continuous DC rating belongs to the normal operating assessment. The varistor voltage is a characteristic measured at a stated current. The clamping value belongs to a specified impulse condition. These are not alternate names for a single voltage threshold. The TDK CU-series datasheet, for example, provides separate continuous-voltage tables and characteristics at a specified measurement current. Its clamping figures have stated 8/20 microsecond test currents. TDK CU-series specifications and definitions
Do not convert an AC rating into a DC rating using a general multiplier when the manufacturer already publishes the applicable DC limit. Nor should a purchaser assume that a MOV advertised for an AC product is qualified for an unrelated DC disconnection duty. The voltage sustained by the varistor and the ability of another element to interrupt a circuit are different approvals.
Ask the designer to state the permitted voltage at the protected equipment terminals under the specified event. A comparison is incomplete if it lists a suppressor's clamping value but never identifies the downstream acceptance boundary. Where the value is uncertain, obtain the equipment manufacturer's relevant evidence rather than turning an absolute-maximum number into a comfortable operating target.
Compare a named datasheet row without approving the application
The following small example uses TDK's CU4032K30G2, ordering code B72660M0300K072, from the November 2025 CU standard-series datasheet. The numbers identify that specific listed component; they do not describe a SINAWATTS product or a recommended selection.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Separate evidence field | Listed value | What the buyer must preserve |
|---|---|---|
| Maximum continuous DC voltage | 38 V | Exact type and applicable rating conditions |
| Varistor voltage | 47 V, plus or minus 10%, at 1 mA | Measurement current and tolerance |
| Maximum clamp | 93 V at 2.5 A, 8/20 microsecond pulse | Current and waveform together |
| Maximum single surge current | 250 A, 8/20 microsecond pulse | Single-event condition |
| Maximum energy | 2,000 mJ for the stated 2 ms condition | Energy and pulse condition together |
The rating table is specified at 85 degrees Celsius, while the characteristic table is specified at 25 degrees Celsius. Those conditions remain part of this example. TDK CU-series electrical tables
Now consider a hypothetical documentary screen with a maximum normal DC voltage of 40 V. The listed 38 V continuous rating does not cover that requirement. The fact that the nominal varistor voltage is 47 V does not repair this mismatch. This screen rejects that proposal against the stated requirement without claiming anything about its eventual physical failure.
In a second hypothetical requirement, suppose the normal maximum is 36 V and the protected-node ceiling is 80 V at the same stated 2.5 A pulse condition. The continuous-voltage screen alone does not reject the part, but a listed maximum clamp of 93 V does not substantiate the 80 V requirement. Passing the first column is therefore not full approval.
Finally, the 93 V clamp must not be copied into a calculation at 250 A simply because both values appear in the same datasheet. The 250 A figure and the 2.5 A clamp test answer different questions. Request the relevant voltage-current evidence and installed assessment for the actual event. A familiar ordering code is useful only when its conditions remain attached.
Turn the surge description into a reproducible evidence request
Ask for more than the peak voltage at the source. The engineering description should identify the source waveform, source impedance or other applicable source model, connection mode, repetition and the state of the protected equipment. The resulting current through the MOV is an assessment outcome or measurement, not necessarily the generator's open-circuit voltage divided by an arbitrary resistance.
Keep supplier reports aligned to the agreed interface. If one report measures directly across the MOV and another measures at a remote equipment connector, label them as different measurement locations. Require the drawing and probe reference points so the engineer can decide whether each record answers the acceptance question.
An energy number is similarly incomplete without its time basis. For a purely hypothetical arithmetic illustration, assume the voltage across a device remains exactly 100 V while the current through it remains exactly 10 A for 1 millisecond. Their product integrated over that rectangle is 1 joule. Extending the same assumed rectangle to 10 milliseconds gives 10 joules.
Neither calculation describes a real MOV waveform or predicts a temperature. It simply demonstrates why pulse duration cannot be omitted. Applying the first result to a datasheet's differently shaped energy test would require a justified equivalence that this arithmetic does not provide.
Require the supplier to distinguish measured traces, calculated traces and catalog limits. For measured records, retain sampling and probe information sufficient to interpret the pulse. For calculations, retain the model, assumptions and version. When only a catalog limit is supplied, record that the installed application result remains unverified.
Review repetition and degradation as an acceptance sequence
Do not turn a single-event surge rating into a lifetime promise by multiplying it by an assumed number of operations. Repetitive duty needs its own evidence, including the event count and interval. The TDK CU-series document provides pulse-train derating information and post-stress characteristic checks. That is a different evidential structure from quoting only the maximum single pulse. TDK pulse and reliability information
Build the requested report around a sequence: initial identification and measurements, defined conditioning or stresses, an agreed recovery period, then final measurements. Decide which measurements establish whether the protection function remains within the project limits. The receiving team needs the approved criterion and method, not just a statement that the sample survived.
For a hypothetical record, a reference characteristic changing from 100 V to 94 V is a negative six percent change relative to the initial value. Whether that change passes depends on the applicable specification, measurement uncertainty and the project's decision rule. The calculation does not establish a universal allowable drift and should not become a new incoming-inspection limit by accident.
Specify how specimen identities remain linked through the sequence. A report that uses one unlabelled component for the initial measurement and another for the final measurement cannot establish drift of the same specimen. Retain serial or sample identifiers, lot references and the report revision together.
If an offered lifetime statement cannot be traced to a matching duty and acceptance criterion, request a bounded claim instead. The supplier may be able to support a particular test sequence while having no evidence for the full service history. That distinction is useful purchasing information and should remain visible in the bid comparison.
Treat thermal disconnection as a separate circuit function
A thermally protected MOV combines the suppression element with a means of opening its branch under specified overheating conditions. Littelfuse's TMOV and iTMOV datasheet describes this integrated function; the iTMOV version adds a monitoring connection. The same document warns that heating, arcing or venting can precede opening under its stated extreme abnormal conditions, making enclosure design relevant. Littelfuse TMOV and iTMOV datasheet, revised October 15, 2025
This is evidence about that manufacturer's defined series and conditions. It is not permission to use any thermal fuse beside any MOV. For an offered discrete arrangement, require the complete component identities, their physical relationship, the controlled assembly drawing and the evidence for the proposed combination.
For a DC project, ask explicitly for the disconnection evidence applicable to the intended supply and fault conditions. Do not infer a DC breaking capability from an AC application illustration, a coating insulation figure or an open-element isolation figure. Each describes a different property, and none should be silently relabeled as the required interruption result.
Also ask what remains energized after the branch opens. The load may continue to operate while that protection path is absent, depending on the circuit. The procurement requirement must state whether the intended response is an alarm, a controlled shutdown, a service action or another reviewed behavior. Avoid the ambiguous requirement that the device must simply fail safe.
For coordinated fuse and holder procurement, the fuse-box category is a starting point for discussing the surrounding assembly. Its existence does not establish a particular MOV, thermal element or short-circuit coordination capability. Exact compatibility must still be confirmed for the quoted configuration.
Distinguish sustained faults from short transients
A short transient test and a sustained abnormal-voltage test answer different questions. A protection branch that handles the specified pulse still needs its separately defined abnormal-condition assessment where the project requires one. Describe the source behavior and the upstream protection rather than assuming that a fuse will always clear first.
Littelfuse's 2016 LED lighting guide illustrates an AC lost-neutral condition in which another load limits the current and a line fuse may not clear while the MOV overheats. This historical AC example supports the distinction between overcurrent clearing and thermal protection. It is not a DC circuit design, a statement of current standards, or evidence that a proposed battery circuit behaves identically. Littelfuse LED lighting guide, temporary-overvoltage discussion
For a DC assembly, request the actual project's documented fault cases and the applicable evaluation evidence. Relevant questions include whether the source maintains voltage, limits current, folds back or disconnects, and what other components remain connected. The engineer must determine the case set; the buyer should ensure the quotation and report use the same set.
A supplier's report should identify any components replaced between cases. If the thermal element is single-use, later results cannot be represented as repeated operation of an unchanged specimen after that element has opened. Preserve the sequence and replacement log so the acceptance decision can be reproduced.
Send the circuit drawing, normal DC envelope and defined fault cases for an RFQ discussion.
Make the loss-of-protection signal unambiguous
Treat the monitor output as a functional interface with its own drawing and acceptance table. A third lead is not automatically a dry contact, a logic output or a complete self-diagnostic system. Require the component pin assignment and the intended monitoring circuit before specifying a connection to a controller.
Prepare a small state table for the complete assembly. Include normal supply present, protection branch disconnected, monitoring supply absent and an open monitor connection where these are relevant project cases. Ask the supplier to state what the controller observes in each case and which states cannot be distinguished.
Do not label an indicator as proof of remaining surge capability unless the exact monitoring arrangement establishes that claim. A signal showing an open thermal element answers a narrower question. The Littelfuse datasheet's monitoring examples concern detection of that disconnection and are presented as application examples requiring user verification. Littelfuse iTMOV monitoring examples
The service instruction should name the action associated with an alarm and identify who is permitted to restore operation. A reset on a controller screen must not be confused with restoring a physically disconnected protection component. Require the replacement identity and any inspection of neighboring parts to follow the approved service process.
For an assembly supplier, include the monitor connector and harness in the scope of supply. Otherwise, two bidders may price different deliverables while both use the same phrase, protection status output. Resolve this before comparing the total assembly price.
Preserve the physical assembly and manufacturing boundaries
Control the physical details that the design evidence relies on: component footprint or lead pattern, thermal-element position, retention method, nearby materials, enclosure barriers and the route to the protected terminals. A mechanically convenient relocation is a proposed design change until its effect is reviewed.
TDK's CU-series precautions identify potential degradation from incompatible potting or adhesive materials and possible package rupture with hot-material expulsion under overload. These cautions reinforce the need to qualify the actual assembly rather than assume that extra encapsulation is always beneficial. TDK mounting precautions
Ask suppliers to disclose the intended process and relevant component-manufacturer restrictions. Where a thermal element is present, the assembly process itself must remain compatible with that element. The Littelfuse TMOV document calls for controlled soldering conditions because it contains a thermal protection device. Use the exact supplier-approved process window rather than transplanting a temperature from another component.
Incoming acceptance and design qualification should remain separate. A visual inspection can confirm an obvious identity or placement discrepancy; it cannot establish the complete abnormal-condition behavior of an unqualified substitute. Likewise, destructive surge or fault testing should be assigned to the agreed qualification or sampling plan, not casually imposed on every shipping unit.
Compare offers and release a traceable configuration
Use a compliance matrix that shows the requirement, the offered evidence and the open decision. Avoid a single pass column that conceals missing conditions.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Purchasing decision | Evidence to request | Reason to hold the offer |
|---|---|---|
| Continuous operation | Exact order code and applicable DC/temperature limits | Normal envelope not covered |
| Defined transient duty | Conditions, current/voltage evidence and repetition basis | Unmatched waveform or unsupported repetition |
| Abnormal condition | Complete branch and disconnection assessment | AC example substituted for DC evidence |
| Monitoring and service | Pin map, state table and replacement instructions | Alarm meaning or energized state unclear |
| Reproducible production | Controlled BOM, drawing, lot identity and change process | Undeclared substitution authority |
Ask for exceptions in writing. An exception is not necessarily evidence of a poor supplier; it can expose an incomplete requirement that other bidders overlooked. Decide whether the missing item blocks a production purchase, permits an engineering sample, or requires a narrower quotation scope.
The purchase order should reference the accepted BOM and drawing revisions, not only a quotation date. Preserve the documents used to approve alternative parts and identify whether those alternatives are approved for every assembly variant or just one configuration. Require new review when a relevant component or process changes.
For a custom assembly discussion, the OEM and ODM service page provides a route to define the requested scope. Send the evidence package and unresolved questions first; confirm feasibility, verification responsibilities and commercial terms for the specific project rather than assuming a catalog capability.
Keep qualification specimens separate from replacement stock
Specify the status of every sample after surge or abnormal-condition evaluation. A unit that still looks normal after a documented stress sequence is not automatically unused stock. The purchase package should identify whether it is retained as evidence, used only for subsequent evaluation or disposed of under the agreed plan. Keep that status visible in the receiving and storage records so a demonstration unit cannot quietly enter a customer shipment.
For a repaired assembly, require a controlled record of the removed and installed component identities. Replacing an opened thermal element while retaining the associated MOV may create a different evidence question from replacing a complete approved module. The responsible designer must determine the permitted repair scope; procurement should not authorize either approach merely to avoid scrapping the board.
Also preserve the measuring instrument range and connection method for any incoming characteristic check. A repeatable numeric result needs the specified stimulus, temperature and measurement location. If the received value falls near an acceptance boundary, apply the agreed uncertainty and decision rule rather than retesting until a favorable value appears. Link that disposition to the same part lot and assembly revision used for release.
Buyer FAQ
Can I choose a MOV from the nominal battery voltage alone?
No. Provide the maximum normal voltage at the actual connection nodes, the relevant operating conditions and the defined transient and fault cases. The name of the battery system does not establish these requirements, and a component's varistor voltage is not its continuous DC operating limit.
Does a higher joule rating make two MOVs interchangeable?
It does not. The energy value has a specified waveform and other conditions, while clamping, continuous voltage, pulse repetition and physical construction remain separate comparisons. Obtain matching evidence for each required function. A favorable energy number cannot close an unrelated continuous-voltage or monitoring gap.
Does an integrated thermal element replace the upstream fuse?
Do not assume that it does. Specify the function assigned to each element and obtain coordination evidence for the complete branch and source. Thermal disconnection under one defined abnormal condition does not establish general overcurrent protection or the upstream device's interruption capability.
Can I use an AC thermal-protection example for a DC circuit?
It can explain a concept, but it does not qualify the DC circuit. Request evidence for the exact device, voltage, available current, source behavior and installed configuration. Keep sustained DC interruption, open-element isolation and continuous MOV voltage as separate evidence fields.
Does a monitor lead indicate remaining MOV lifetime?
Only claim what the documented monitoring circuit actually establishes. Detection of an opened thermal element is not a measurement of remaining surge endurance. State whether the indicator can distinguish loss of protection, loss of supply and a broken monitoring connection before approving the controller interface.
Should every delivered unit receive the full surge qualification sequence?
The acceptance plan must decide this. Do not assume that a stress sequence is nondestructive or leaves every component equivalent to an unstressed production item. Agree which checks are routine production tests, which use separate qualification specimens, and how tested samples are identified and disposed of.
What information should accompany the first RFQ?
Send the connection drawing, normal DC envelope, component-location temperature, defined transient duty, fault-case requirements, desired behavior after disconnection and the monitor interface. Add the accepted evidence format and list unresolved decisions. Suppliers can then identify what is included, excluded or conditional in a comparable proposal.
Send the MOV evidence matrix and assembly drawing to discuss a controlled sourcing package.