Choose a TVS diode by checking two operating envelopes: the normal voltage that must pass without unacceptable loading, and the transient voltage and current that the complete protection circuit must withstand. Keep standoff voltage, breakdown voltage and clamping voltage in separate quotation fields. A matching nominal voltage or package size does not demonstrate equivalent protection.
A transient voltage suppressor can be considered at a power or signal interface where the responsible engineer has identified an overvoltage event. Procurement's role is to obtain the correct component and evidence for that defined application. It is not to infer an immunity requirement from a product photograph, substitute a larger wattage number for an engineering review, or promise that a component makes a finished assembly compliant.
This guide uses a named manufacturer's data table to illustrate rating interpretation and hypothetical inputs to demonstrate a bid-screening method. It does not report SINAWATTS testing or approve a particular circuit. The intended output is a controlled RFQ that makes missing evidence visible before an attractive piece price becomes a production commitment.
Establish the protected interface and its normal range
Begin with a drawing of the interface. Identify the source connector, protected node, return reference and any other path that can supply energy. State whether the offered item is a loose component, a populated board, an inline assembly or a finished equipment input. The same semiconductor mounted in those different arrangements does not come with the same installation evidence.
Ask the product engineer for the maximum and minimum normal voltage at the TVS connection, including source tolerance and all intended operating modes. For a battery system, a nominal battery label alone is not a complete voltage requirement. For a signal interface, identify any permitted negative excursion or common-mode offset relative to the actual protection return.
Record the temperatures relevant to normal operation and the permissible loading of the line. If leakage is important to standby consumption or input accuracy, request a maximum under the specified voltage and temperature conditions. If the component sits on a communications path, ask the interface designer which capacitance or signal-integrity evidence is required. A supplier should not have to guess whether a quoted protection part is connected to power or to data.
Separate normal operation from an abnormal condition that lasts longer than the intended surge. A wrong power supply, sustained overvoltage or wiring error may require a different protective response. Put those conditions on the system review list rather than assuming that the pulse rating covers an indefinitely applied source.
The existing DC harness blocking-diode guide addresses a series component with a different circuit role. Keep the series current path and the shunt protection path distinct in the RFQ schematic.
Read three voltage descriptions as different evidence
Standoff or reverse working voltage defines the normal-voltage selection boundary under the manufacturer's stated conditions. Breakdown voltage is specified at a particular test current. Clamping voltage is linked to a much larger pulse current and waveform. TI's selection report makes these distinctions and warns against using breakdown voltage as the normal operating limit. TI surge-diode selection report, sections 2.1–2.4
A purchasing comparison should retain the symbol, value, temperature and test condition together. When one quotation says “24 V protection” and another says “39 V clamp,” do not assume that the descriptions contradict each other. They may identify different points on the same component characteristic. Ask the supplier to complete the missing columns before deciding that the second offer is unsuitable.
Also distinguish minimum, typical and maximum values. A typical curve can help an engineer explore a design, but it is not automatically a shipment acceptance limit. A breakdown range at a low test current does not establish the maximum voltage at a protected circuit during a higher-current event.
Keep the downstream equipment limit separate from these component ratings. Ask the engineer what voltage is permitted at the protected node, for what duration and under which conditions. An absolute maximum rating needs proper engineering interpretation; it should not be treated as a comfortable repetitive operating target. Procurement should receive an approved design allowance rather than invent one.
A practical document check uses four short questions: what voltage is normally present, what current defines breakdown, what pulse defines clamping, and what node must remain below the approved limit? If any answer is missing, the technical comparison is incomplete.
Compare a real data-sheet row without approving an application
Vishay's SMBJ data sheet provides the following values at its stated reference conditions. The clamping figures apply at the listed peak pulse currents, with the specified 10/1000 microsecond waveform; they are not continuous-power ratings.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Vishay device | Standoff voltage | Breakdown range at 1 mA | Maximum clamp at listed pulse current |
|---|---|---|---|
| SMBJ24A | 24 V | 26.7–29.5 V | 38.9 V at 15.4 A |
| SMBJ26A | 26 V | 28.9–31.9 V | 42.1 V at 14.3 A |
The document identifies 25°C as the default reference and requires pulse derating above that temperature. Its 600 W designation is tied to the specified pulse and mounting conditions. Vishay SMBJ data sheet, rating notes and electrical table
Now consider a hypothetical documentary screen with a 25 V maximum normal interface voltage and a 40 V engineering ceiling for the relevant transient. The first row has a standoff value below the assumed normal maximum. The second row clears that simple normal-voltage comparison, but its listed maximum clamp exceeds the assumed ceiling at the listed test point.
Neither row is approved by this comparison. It does not establish the current that the actual source will drive through either component, and it does not convert one pulse waveform into another. The result is that a buyer cannot satisfy both requirements merely by choosing between these two voltage labels.
The useful next step is to ask the design owner whether a different protection arrangement, a different component or revised equipment limits can close the requirements. Do not ask a vendor to erase the discrepancy by replacing a maximum value with a typical one. Keep the original requirements and the proposed engineering change visible in the quotation history.
This example also shows why higher standoff voltage is not automatically a better offer. It can change the clamping comparison. A controlled substitution review must consider both normal operation and the transient response, with the conditions attached to each.
Specify the event before comparing pulse capability
A surge request needs more than a voltage amplitude. Ask the engineering or compliance owner to identify the waveform, source impedance, coupling arrangement, polarity, number of events and interval between them. Include the operating state of the equipment during the event and the required behavior afterward.
The source description matters because the current through a shunt component depends on the complete circuit. A generator's open-circuit voltage is not the voltage that will necessarily appear across the loaded TVS. A current value obtained with a short-circuited output is also not, by itself, a measured current in the finished product.
TI's report explicitly distinguishes pulse-current ratings associated with different waveforms and recommends using evidence for the applicable waveform instead of treating a rough duration conversion as an exact rating. TI pulse-current and clamping discussion
Turn that into a supplier response requirement. Ask the vendor to identify which specified events are covered directly by its component documentation, which need application evidence, and which are outside the proposed scope. A blank response should remain open rather than being interpreted as agreement.
If the project references a standard, obtain the applicable edition, test level and product-specific requirements from the responsible compliance team. This guide does not establish which standard applies to a particular product or whether a supplier's component marking proves finished-system compliance.
For a PV distribution installation, the PV surge-protective-device procurement guide discusses a different assembly-level decision. A discrete TVS choice should not silently replace an independently specified protective device.
Use a calculation to expose assumptions, not to hide them
The following is a hypothetical constant-level screening model. Assume a source represented by 100 V in series with 4 ohms, and assume a protection node held at 40 V during the portion of an event being considered. Ignoring every other branch, the source current at that instant would be (100 − 40) ÷ 4 = 15 A.
The corresponding product of assumed clamp voltage and current is 600 W. That result does not mean that any component advertised as 600 W is suitable. The model has not defined the duration, changing source voltage, actual clamp characteristic, temperature, current in other branches or installation parasitics.
If the assumed clamp level were 50 V instead, the same simplified source model would give 12.5 A and 625 W at that instant. The calculation illustrates why comparing a current number alone can mislead. It is not a physical prediction that a real diode will hold either arbitrary voltage.
Ask the engineer to state which model or measurement establishes the application's current and voltage waveforms. If a simulation is used, identify the component model, source definition and relevant assumptions. If a test is used, identify where the probes measure and how the fixture relates to the intended assembly.
Keep peak power separate from energy. An instantaneous product does not describe the integral over the event, and a single energy total does not fully describe the peak stress or repetitive heating. The acceptance package should preserve the waveform or the manufacturer's applicable test definition instead of reducing every event to one convenient number.
Procurement can use this example to detect an incomplete bid calculation. A supplier calculation should show its inputs, units and boundary. Ask where its clamp value came from and whether the waveform and temperature are supported. An unexplained spreadsheet result is not stronger evidence merely because it contains several decimal places.
Keep polarity and the return path under drawing control
Specify the intended normal polarity, any permitted reverse voltage, and both transient polarities that the system must address. Obtain the exact unidirectional or bidirectional order code and its applicable electrical behavior. Do not infer the device's circuit role from a package band without checking the manufacturer's drawing and the approved schematic.
The protection return is part of the requirement. Identify whether it connects to a signal return, power return, chassis or another engineered reference. A supplier should not choose a convenient nearby conductor and call it ground. The acceptable connection depends on the product architecture and the disturbance path.
Ask the design owner to include the relevant routing and connection details in the controlled assembly drawing. An inline module, a small board and a long branch lead can place the protective element in different physical relationships to the node it is meant to protect. Request application evidence for the offered arrangement instead of transferring a result from an unspecified fixture.
Record orientation before any potting, heat-shrink or cover hides the component. Agree the inspection reference and the traceable record required for the assembled product. A photograph can support traceability, but it does not replace an electrical check or establish surge performance.
Where protection components are incorporated into a cable assembly, send the interface schematic and installation drawing to SINAWATTS. Include the source and return definitions, the proposed component and the evidence you require. The response should confirm the supply scope and open engineering questions; no manufacturing or test capability is assumed here.
Define the thermal and repetitive-use boundary
Ask which temperature the supplier uses for each rating. Ambient, terminal, case and junction conditions are not interchangeable labels. Retain the manufacturer's reference and mounting description in the comparison sheet. A result from an exposed evaluation board should not be relabelled as a result from a sealed harness module.
Describe the intended duty sequence. Is the requirement a small number of defined qualification events, repeated operating transients, or an abnormal event followed by replacement? The evidence must match the actual mission profile. A successful single event does not establish unlimited repeated performance.
The supplier should identify the cooling interval and sample preparation used for any claimed result. If the assembly has already been exposed to another test, record that history. Different preparation can make two apparently identical reports describe different conditions.
Request engineering approval for any material or construction change that alters the component's surroundings. Covers, encapsulants, conductor dimensions and board layout may be relevant to the installation review. A purchasing substitution should not be approved solely because the external dimensions remain unchanged.
The harness overmold and potting guide helps specify process evidence. For a protection module, the design owner must separately determine whether that process changes the electrical or thermal protection boundary.
Treat sustained source faults as a system issue. Ask what happens if an abnormal voltage remains present or a protective component is no longer functional. Upstream interruption, service action and fault indication belong to the complete design. Do not invent a universal failure state or assume that every TVS fails safely in the same way.
Request an acceptance report that can be reproduced
Define acceptance before samples are tested. The engineering plan should specify the article revision, test arrangement, conditions and required results. “Surge passed” is insufficient if the report does not identify the protected node, load state or event sequence.
Use a report checklist that separates what was applied from what was observed. Record the source configuration and coupling method as applied conditions. Record actual monitored voltages, currents and equipment behavior as observations. State which quantities were measured and which were calculated.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Evidence item | Procurement question | Release condition |
|---|---|---|
| Component identity | Does the report identify the offered manufacturer and suffix? | Approved construction matches the sample |
| Event definition | Are polarity, waveform, source and repetitions specified? | Relevant requirement is covered without substitution |
| Measurement locations | Are protected-node and return references shown? | Results can be interpreted against the approved limits |
| Operating behavior | What function was monitored during and after exposure? | Agreed functional and electrical criteria are met |
| Change control | What changes invalidate the evidence? | Supplier accepts the documented notification process |
Agree responsibility for the test. The component manufacturer may supply device data, while an assembly supplier provides manufacturing records and an appropriate laboratory performs the agreed application evaluation. Confirm each party's actual scope. This article does not assert that SINAWATTS has a specific surge laboratory or qualification capability.
Retain failures and deviations as well as successful results. If a sample was repaired, replaced or tested under altered conditions, the final report should state that history. A clean summary without the relevant deviation record can hide a difference between the tested sample and the production offer.
Separate production inspection from design qualification. Routine checks may verify identity, orientation, connections or selected electrical characteristics. They do not automatically reproduce the complete immunity test. The quality plan must explain what each check demonstrates and what it leaves to qualification evidence.
Preserve lot identity and measurement provenance
Link the evidence package to the purchased lot. Ask which labels, purchase documents and inspection records identify the actual manufacturer and full order code. If a distributor or assembly contractor changes the source, the release process should preserve that identity instead of retaining only the customer's short internal description. A compatible footprint is not proof that two delivered parts share the same electrical limits.
For a populated subassembly, request a revision record that connects the component list to the layout and any protective covering. If a production repair replaces the TVS, define the verification and record needed before the unit returns to accepted stock. Keep that requirement proportional to the product risk and the agreed quality plan; this guide does not prescribe a universal inspection frequency.
Measurement provenance also affects offer comparison. A reported peak may depend on the measurement point, fixture, bandwidth and stated uncertainty. Ask the responsible test engineer to identify these conditions and the handling of uncertainty relative to the acceptance limit. Procurement should not select the lowest displayed peak from reports that measured different nodes or used incompatible methods.
Finally, distinguish the date of a report from the design revision it supports. A newer cover page does not prove that an older sample represents the current assembly. Require an explicit applicability statement for retained evidence, including any deviations and the engineering decision that accepts them.
Compare supplier offers by the decisions still open
Build the bid comparison around requirements rather than marketing categories. Put the exact component, normal range, relevant clamp evidence, pulse conditions, mounting and deliverables in aligned rows. Ask vendors to mark deviations explicitly, including assumptions they need the customer to accept.
A lower-price offer may exclude a board, enclosure, inspection report or application test that another offer includes. Resolve those scope differences before comparing unit cost. Do not publish or assume a standard price, MOQ or lead time; obtain a current written quotation for the agreed configuration.
Use the SINAWATTS OEM/ODM service page to describe a project that needs sourcing or assembly review. Include whether the semiconductor is customer-specified, supplier-proposed or supplied by the customer. State who owns the protective design and who approves substitutions.
For an alternative manufacturer, require a line-by-line difference record rather than accepting a similar base part number. Retain the reference temperature, pulse waveform, maximum values and package drawing. Resolve differences through the design owner instead of averaging two data sheets or mixing one manufacturer's clamp figure with another's current rating.
Before release, the buyer should be able to identify the approved drawing, evidence, exceptions, quantity basis and acceptance plan from one controlled package. If an open technical item remains, define the sample or documentation action that closes it and who can sign it off.
Send the TVS protection RFQ package to SINAWATTS with the normal voltage range, surge definition, protected-node limits, schematic and intended supply scope. Ask for a response that distinguishes confirmed information from items requiring engineering or supplier verification.
Buyer FAQ
Is a 24 V TVS automatically suitable for a nominal 24 V circuit?
No. Identify the circuit's full normal voltage range and the exact meaning of the quoted rating. Compare normal operation with the manufacturer's working-voltage conditions, then assess clamping against the protected-node requirement. A nominal supply description does not resolve tolerances, charging conditions or transient behavior.
Can breakdown voltage be used as the protected circuit's maximum voltage?
Breakdown is defined at its stated test current. The transient clamp must be evaluated at the applicable pulse current and waveform. Ask the engineering owner to approve the permitted voltage at the protected node, including relevant duration and installation effects, rather than treating a breakdown number as the finished assembly's limit.
Does a larger peak-watt rating always improve protection?
It does not answer all selection questions. A component can have a larger pulse capability while offering unsuitable normal-voltage behavior or a higher clamp under the relevant condition. Compare the full requirement set and keep pulse duration, temperature and mounting attached to every power claim.
Can a rating for one waveform be converted to another by simple scaling?
Do not treat a rough scaling calculation as a guaranteed rating. Obtain manufacturer evidence or application evaluation for the required waveform. The source, duration, current and temperature conditions must be consistent. If the supporting evidence is missing, record that item as unresolved in the bid comparison.
What if a vendor provides only a typical clamping curve?
Ask which maximum specification or controlled application evidence supports the design requirement. A typical curve can be useful for preliminary analysis, but it does not by itself establish the worst permitted production behavior. Keep the distinction explicit when the supplier signs its technical response.
Should a TVS replace the upstream fuse or other protective device?
Assign each protective function through the complete circuit design. A shunt transient suppressor and an overcurrent interrupter address different requirements. The engineer should specify their coordination, abnormal-source behavior and service response. Procurement should not remove a required protective function because a TVS is present.
What information should be sent with the first enquiry?
Send the normal voltage range, protected-node requirement, event definition, schematic, mounting arrangement and quantity basis. Include existing component choices and their unresolved evidence gaps. Ask for the exact offered order code, source documents, scope, exceptions and proposed acceptance records before requesting a production commitment.