Select a PPTC using the maximum normal current at its actual operating temperature, the required fault response, and the behavior after the fault is removed. A room-temperature current label cannot answer all three questions. Procurement also needs the allowable voltage loss, the residual current during a trip, and a defined restart condition. Those requirements turn a resettable-fuse quotation into an application that can be evaluated.
A polymer positive temperature coefficient device, usually shortened to PPTC, changes from relatively low resistance to high resistance when it trips. That makes it useful to investigate for certain repeatedly connected accessories, control circuits and low-current harness branches. It does not establish suitability for an unrestricted battery supply, a safety isolation function or any particular SINAWATTS assembly. The engineer responsible for the complete circuit must approve its protective role.
This guide addresses the purchasing decision behind the phrase “resettable fuse.” It separates carrying current, limiting a fault and returning to useful operation. The numerical screening example uses an identified manufacturer's table; the later voltage-drop example is explicitly hypothetical. Neither is a completed product qualification or a recommendation to substitute a device in existing equipment.
Define what the protected branch must do
Start the RFQ with a circuit sketch showing the source, the proposed PPTC, the load, the return and any connection that can feed power backward. Include the connector at which the fault can occur. A sensor branch supplied through an electronic current limit can present different conditions from an apparently identical connector connected directly to a battery. The available fault current belongs to the whole source path.
Describe normal operating states separately. A standby state, a warm-up pulse, a continuously powered state and a repeated start sequence may each matter. Give the engineer's maximum normal current with its duration and tolerance, rather than the average recorded during a demonstration. If a controller changes its behavior at low voltage, include that fact because voltage loss through the protection device can affect the load itself.
Then define the intended outcome of a fault. Does the branch need to remain current limited until a service person removes power? May it restart automatically after a disconnected accessory is reconnected? Must the equipment report an error before trying again? These are different system requirements. Buying the cheapest part described as self-resetting leaves the restart behavior undecided.
For circuits also using conventional branch fuses, the guide to DC fuse voltage and fault-current ratings covers a separate selection problem. Keep the upstream fault-interruption requirement visible in the schematic even when a PPTC is added downstream.
Read the terms without turning them into one current rating
Bourns distinguishes hold current, which can pass without interruption, from trip current, which changes a device to its high-resistance state. It separately defines maximum fault current at rated voltage. Read the selected device's own reference conditions before comparing these figures. Bourns circuit-protection definitions
A buyer should therefore create separate quotation fields. Put normal-current requirements in one column, fault waveform requirements in another, and source limits in a third. A vendor response that fills every column with the same ampere number is incomplete. Ask for the reference temperature and whether each figure is a guaranteed limit, a typical curve or an engineering recommendation.
Avoid treating the space between a hold-current figure and a trip-current figure as a precise switching threshold. The purchasing question is whether the intended normal state is supported and whether the intended abnormal state has adequate response evidence. An undocumented middle region provides neither assurance. Ask the application engineer to resolve it rather than choosing a trip time by interpolation from unrelated data.
Also distinguish maximum fault-current capability from the current at which protection is desired. A device's ability to withstand a specified fault condition does not say that the protected conductor or electronic component can survive until the device responds. Those two requirements need to be compared on the same circuit and time basis.
Compare hold current at the hottest operating condition
The RXEF temperature table lists the following hold currents. These values belong to the identified family and reference conditions, not to every product with a similar current label. Littelfuse RXEF temperature rerating table
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Candidate in the source table | Hold current at 20°C | At 60°C | At 70°C |
|---|---|---|---|
| RXEF050 | 0.50 A | 0.32 A | 0.27 A |
| RXEF065 | 0.65 A | 0.41 A | 0.35 A |
Consider a hypothetical 0.35 A maximum normal load with a local ambient of 60°C. RXEF050 falls below that load at the stated ambient, despite its 0.50 A room-temperature figure. RXEF065 exceeds the load by 0.06 A at 60°C. At 70°C, its listed hold current equals the assumed load; the arithmetic leaves no additional allowance for uncertainty.
That calculation is a screening decision. It does not approve RXEF065. It does not establish the actual board temperature, the effect of the enclosure, the required trip speed or the device's performance after an earlier trip. It identifies why one apparently acceptable offer should be rejected at this stage and what remains to be demonstrated for the other.
Write the example as two questions on the bid sheet: “What temperature applies at the protection device?” and “What normal current must it carry there?” If either answer is missing, mark the selection pending. Do not substitute the room temperature outside the equipment for the temperature near the installed component.
For a wider enclosure study, the DC fuse ambient and enclosure guide explains why installation conditions must be recorded. Use the selected PPTC manufacturer's own data for this device; a correction chart for a melting fuse is not a PPTC specification.
Describe the thermal environment so vendors quote the same assembly
Send a drawing that locates the device relative to heat-producing components, copper areas, wiring and the enclosure wall. Identify whether the quoted sample is a bare component, a circuit board or a finished harness assembly. A sample tested in open air and a production unit inside a sleeve are different physical configurations, even when their component part numbers match.
Give the expected temperature range and explain how it was established. If it is a preliminary engineering estimate, label it as such. If measurements exist, identify the sensor location, load state, enclosure condition and recording period. A single peak without those details cannot tell a supplier whether it represents local air, component surface temperature or a nearby hot connector.
Treat added potting, adhesive, foam, covers and cable wrapping as drawing-controlled features. Ask the engineer whether each change requires renewed thermal evaluation. The purchase order should not allow a shop-floor packaging change to redefine the protection device's environment without review.
A useful bid response lists assumptions explicitly: proposed placement, lead or land pattern, airflow condition, insulation and temperature evidence still required. That gives purchasing a way to compare scope instead of comparing only piece price. If these details are incomplete, send the branch sketch and installation constraints with the RFQ, requesting clarification of the proposed supply scope rather than assuming that a catalogue part comes with application approval.
Check abnormal current as a timed event
Specify the abnormal conditions that the product engineer has identified. A stalled load, reversed accessory connection, damaged cable and repeated overload can have different current shapes. Include source voltage and source limiting behavior. A fault description should say where the current was measured or estimated, how long it can persist, and which item must be protected.
Request the manufacturer's response information for the selected device, including its conditions and limitations. A typical curve can support preliminary comparison, but the buyer must not relabel it a guaranteed maximum trip time. Where the design depends on a maximum response, ask which controlled specification or application test will establish it.
Put the protected item's acceptance limit alongside the protection response. For example, the engineering requirement may concern connector temperature, conductor insulation or an electronic input. Purchasing should receive a signed acceptance criterion from the responsible designer. It should not invent a thermal damage threshold from a photograph or a similar product's rating.
Include cold-start and hot-restart conditions in the proposed evaluation. If the load has repetitive pulses, identify pulse width, spacing and number of repetitions rather than providing only the largest current. The repetitive-pulse fuse guide is useful for organizing a waveform request, although its conventional-fuse conclusions must not be transferred to PPTC parts.
The completed comparison should distinguish “normal load supported,” “fault response demonstrated,” and “fault withstand supported.” Passing one of those rows must not automatically mark the other two as accepted.
Budget voltage loss after a trip, not only when the part is new
A resettable device needs to return to a resistance that still lets the load operate. The RXEF document defines a maximum resistance measured one hour after a trip for its radial-leaded devices under the specified reference conditions. It is a timed measurement definition, not a promise that every application has fully recovered after a brief power cycle. Littelfuse RXEF resistance notes
Here is an illustrative calculation using invented design inputs, not values assigned to a commercial SKU. Assume a branch draws 0.40 A. A proposed resistance limit of 0.30 ohm gives 0.12 V drop using V = I × R. A post-event limit of 0.75 ohm gives 0.30 V. At the same current, the corresponding I²R figures are 0.048 W and 0.12 W. These calculations compare the stated inputs; they do not predict temperature or the hot operating resistance.
If the system allocates only 0.20 V of its voltage budget to this protection device, the second case exceeds that allocation. A supplier cannot resolve the issue by showing only the lower initial resistance. The buyer needs an approved post-event limit or a revised circuit design. Include wire, contact and connector losses elsewhere in the total budget so the same voltage allowance is not spent twice.
Also specify when resistance is measured and how the sample was prepared. “After reset” is ambiguous without a cooling period, ambient condition and prior event. The cold-resistance acceptance guide provides a useful model for documenting measurement conditions, while the actual PPTC limits must come from its own specification.
Define what residual current is allowed to do
Bourns defines leakage current as a small current that continues through a device in its high-resistance mode. That definition is enough to prevent a procurement mistake: a PPTC trip should not be described as a physical disconnection or guaranteed zero current. Bourns circuit-protection glossary
Turn that distinction into a circuit-specific question. With the protection device tripped, can the remaining supply path keep a controller partly powered, light an indicator, charge an input capacitor or sustain a fault that the system requires to be de-energized? The answer depends on the circuit. Ask for measurements or analysis at the specified source conditions rather than a generic statement that leakage is small.
If the design requires a maximum off-state current, enter its limit and measurement point in the RFQ. Do not derive a universal leakage allowance by dividing nominal supply voltage by an assumed resistance. The tripped device and the load form an operating system, and the needed evidence must describe that system.
Record the intended isolation and service arrangements separately. Where safe maintenance requires disconnection, the responsible engineer must provide the appropriate disconnect method. Labeling a PPTC “resettable fuse” does not settle that requirement. This boundary is particularly important when an auxiliary harness is installed near a much larger energy source.
A supplier's response should make clear whether residual current was measured, calculated under stated assumptions, or left unresolved. Procurement can then hold the unresolved safety or function requirement for engineering review without incorrectly claiming that the entire component is unsuitable.
Make restart behavior an explicit acceptance requirement
Fuzetec states that reset time depends on the device and circuit conditions, including ambient temperature and the current and voltage across the part. Its FAQ also distinguishes time-to-trip information from recovery behavior. Fuzetec PPTC recovery FAQ
Use that distinction to write a restart scenario. Define the fault first, then specify what the user does: disconnect an accessory, remove the upstream supply, wait a stated period or issue a controller reset. Define what the system must do afterward. It might need to resume operation within an engineering-approved interval, retain a fault indication, or remain disabled until inspection.
State what qualifies as recovered. Resistance below an approved value, successful start at the minimum supply voltage, and absence of another unintended trip are separate observations. A device can pass a low-current continuity check while the assembled load still fails to restart. Acceptance should follow the intended product behavior.
Include the case in which the fault remains present. A service instruction that tells a customer simply to cycle power can be inappropriate when the fault has not been removed. The evaluation plan should establish the equipment's behavior for that condition and specify which action requires service personnel.
For production purchasing, ask for a recorded sequence that another laboratory can reproduce: initial condition, event, recovery intervention and final assessment. Do not ask a vendor to guarantee a universal number of reset seconds while withholding the installation and load. A repeatable scenario is much more useful than a vague promise of automatic recovery.
Freeze the assembly and the evidence needed for approval
A qualification package should identify the exact manufacturer part number, revision of the source data, approved alternate policy and drawing revision. Include the proposed position and termination details. If the component is supplied on a board, record the board revision; if it is inside a harness, record the insulation and attachment configuration.
Separate supplier declarations from independent observations. A certificate of conformity can identify what was shipped. It does not replace a record showing how the assembly behaved under the agreed operating conditions. Conversely, a successful engineering sample is not evidence that every later lot used the same component without traceability.
Ask the supplier to propose the production controls that preserve the approved design. These might include incoming identity checks, appearance inspection, dimensional checks and a defined resistance check where appropriate. The responsible engineer should choose limits and sampling. Avoid imposing a destructive or stressing routine on every device merely because it was used during qualification.
Keep test records connected to sample identifiers. Record which samples were new, which experienced a trip, and which were used for recovery checks. Mixing them after testing can create misleading resistance comparisons. Returned or previously exercised engineering samples should not silently become the reference for as-received production limits.
The OEM and ODM service page is a place to frame an assembly inquiry. A documented component requirement still needs a supplier response confirming scope and feasibility; this guide does not claim that a particular PPTC configuration, qualification service or manufacturing process is available.
Control a substitute through the same decision gates
An approved alternate should have its own completed comparison, even if the supplier considers it a direct replacement. Require written notice before changing manufacturer, family, package, assembly position or surrounding insulation. The designer can then decide which evidence transfers and which must be renewed. This avoids making purchasing staff responsible for approving an undocumented electrical change.
Consider a hypothetical production shortage. Supplier A proposes a component with the same room-temperature hold current and a smaller package. That response resolves neither the hot operating point nor the post-event voltage budget. Keep the original drawing in effect while the alternate is screened. Record the proposed part as a candidate, not as an accepted change to the bill of materials.
If engineering accepts the alternate, identify the first affected order or lot and retain the supporting review. If the alternate is rejected, record the reason with enough detail to prevent the same offer being resubmitted as an equivalent part on the next purchase. A rejected hot-current limit is more informative than a note saying “not approved.”
The commercial response can still move forward while technical work is pending: suppliers may quote separate options, lead-time assumptions or sample scope. Those are offers to be confirmed, not proof that the application meets its requirements. Release the production substitution only after the remaining technical rows have named evidence and an accountable approval.
Compare quotations by unresolved risk and delivered scope
Build a bid matrix with a row for each requirement that can change the decision. Useful rows include exact part identity, supported normal current at temperature, initial and post-event resistance, voltage and fault limits, response evidence, residual current and restart behavior. Add the assembly drawing revision and the proposed acceptance records.
Use clear result labels: supported by a named document, supported by an identified application record, awaiting confirmation, or does not meet the requirement. Avoid a single “equivalent” checkbox. Two parts may be mechanically interchangeable while their resistance and recovery behavior require a different operating decision.
Separate the price for the component from the price for a finished assembly or additional documentation. Ask suppliers to identify which requested work is included in the quotation. Do not infer test capability from a promise to send samples, or infer sample availability from a product webpage.
For a harness that also needs a conventional distribution enclosure, the fuse-box category provides related purchasing context. Keep its circuit-protection requirements separate from the PPTC branch selection, and state the intended coordination in the RFQ.
Once the engineer has narrowed the candidates, submit the operating-current range, local temperature, voltage-loss budget and restart requirement. Ask for an itemized response to those conditions. That request supports an evidence-based quotation without pretending that a single component label defines the behavior of the finished product.
Buyer FAQ
Is a 0.5 A PPTC suitable for every circuit drawing less than 0.5 A?
No. Identify what the 0.5 A figure means, its reference temperature, the maximum normal load and the actual installation. The example above shows why a room-temperature label can be insufficient at elevated ambient temperature. The selected device also needs appropriate voltage, fault-response and recovery evidence for the circuit.
Can a PPTC replace the main fuse connected to a battery?
Do not approve that substitution from a hold-current comparison. The main protection must address the source's fault conditions and the equipment's protective requirements. A PPTC branch proposal needs an explicit engineering decision about its role, upstream protection and residual current. A small auxiliary circuit and the main battery path are different applications.
Does “tripped” mean the load is electrically isolated?
No. High resistance can still allow residual current. Specify what the downstream circuit must do in that condition and whether a separate disconnect is required. A continuity result or an extinguished indicator is not, by itself, an isolation assessment.
How long should the user wait before trying to restart?
There is no universal waiting time in this guide. Use the selected part's information and application evidence to define a repeatable recovery action and a safe restart requirement. The plan must account for ambient conditions, the supply state and whether the underlying fault has actually been removed.
Why should a quotation include resistance after a trip?
The load must still receive adequate voltage when it resumes operation. A low as-received resistance does not establish the resistance after the relevant event and recovery period. Set the measurement conditions and compare the result with the branch voltage budget.
Are two parts with the same hold current interchangeable?
Not automatically. Compare temperature behavior, fault response, voltage and fault limits, resistance, physical installation and recovery evidence. Ask the engineer to approve the exact alternative and the conditions under which the previous qualification remains valid. Preserve that decision with the bill of materials.
What should a buyer provide before requesting samples?
Provide the circuit sketch, supply range, maximum normal current, expected abnormal conditions, installation temperature, physical envelope and intended restart behavior. Also identify whether samples are for initial electrical screening or for a finished-assembly evaluation. Clear purpose prevents a bare-component result being mistaken for approval of the installed product.
Source scope and purchasing boundary
The linked Littelfuse datasheet supplies the specifically identified device definitions and temperature-table values. Bourns supplies the leakage terminology, and Fuzetec supplies the stated recovery considerations. These official sources were checked on 18 November 2026. Their component information is not a claim about SINAWATTS certification, inventory or test facilities.
The procurement sequence, hypothetical voltage calculation and proposed acceptance records are guidance for organizing an engineering decision. Obtain the current documentation for the exact orderable part and resolve the remaining application requirements with its manufacturer and the responsible product engineer before approving a substitution or production release.