Separate connector material GWFI and GWIT from finished-part GWEPT evidence. Check the exact housing, thickness, test scope and approval route before ordering.

Published by SINAWATTS · Last reviewed 10 November 2026 · Editorial and source policy

Approve a glow-wire claim only after identifying what was tested, which requirement applies, and how the tested material or part connects to the exact connector being purchased. A resin data card and a finished-housing test report occupy different places in that evidence chain. Neither a high temperature printed in a quotation nor a UL 94 classification, by itself, closes every glow-wire requirement for an appliance or electrical assembly.

A useful purchasing question is therefore more specific than “Is the connector flame retardant?” Ask whether the supplier offers material preselection data, a result on a defined connector configuration, or both. Then let the responsible equipment reviewer confirm how those documents satisfy the project's applicable approval route. This guide helps buyers organize that handoff without inventing a universal test temperature, treating a catalog family as a blanket approval, or repeating an old application flowchart as current regulation.

Start with the equipment requirement, not the largest temperature

Before requesting samples, record the equipment type, intended market, governing product standard and edition, and the component's role. Also identify who owns the compliance decision. Procurement should obtain these inputs from the equipment designer or designated reviewer rather than infer them from a connector brochure. Otherwise competing suppliers may quote different evidence packages that appear comparable only because their offers all contain the words “glow wire.”

The distinction matters when one bid includes a material rating and another includes testing on a molded part. The first may be useful for an accepted material preselection route; the second may address a particular component test. A buyer cannot decide which is sufficient without the requirement that the equipment evaluation actually imposes. Asking every bidder for the same temperature does not solve that missing requirement.

Use a requirement line with four fields: the relevant standard or specification, the criterion that must be satisfied, the evidence route the project accepts, and the person authorized to close exceptions. If those fields are incomplete, request a clarification before treating the quotation as technically equivalent. This is a purchasing control, not an instruction to perform a laboratory test or to certify the finished equipment yourself.

Use a short release sequence before requesting a commercial decision:

  1. Identify the applicable equipment requirement and accepted evidence route.
  2. Match the quoted ordering code and revision to the supporting documents.
  3. Check whether each value concerns material specimens or a defined component.
  4. Resolve missing coverage and criteria with the authorized reviewer.
  5. Record the accepted production identity and change-notification conditions.

If the first step is missing, hold the equivalence decision. If the second or third step fails, request corrected evidence. If the documents match but a criterion remains unresolved, keep the technical disposition open. This sequence prevents a complete-looking report package from being mistaken for an approved purchasing decision.

Separate GWFI, GWIT and GWEPT in the comparison sheet

The public scope of IEC 60695-2-12:2021 describes GWFI as a materials test using standard specimens. It also explains that GWFI and GWIT data can contribute to a material preselection process. The scope of IEC 60695-2-11:2021 instead identifies a test on an end product under defined conditions. These distinct scopes are the starting point for comparing evidence, not alternative labels for one result.

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Evidence labelObject to identifyProcurement questionUnsupported shortcut
GWFIMaterial grade and tested specimen detailsDoes the material record cover the proposed material and relevant conditions?Calling the number a completed connector test
GWITMaterial grade and ignition-test referenceIs this the required material ignition evidence under the stated edition?Treating it as the same measurement as GWFI
GWEPTDefined end product or component configurationDoes the report identify the connector being offered and the tested arrangement?Extending one part result to every similar housing
UL 94 classificationThe identified material or component recordWhich separate flammability requirement does this document address?Using a flame classification as an automatic glow-wire substitute

Keep the full method identity next to every value. A spreadsheet column headed only “temperature” invites accidental comparisons between unlike results. A second column headed “tested object” often exposes the problem immediately: one attachment refers to a resin plaque, another to a two-position header, and the quotation is for a differently configured cable housing.

Terminology in supplier documents can also be abbreviated. If “GWT,” “GW,” or “glow-wire compliant” appears without a clear method and scope, ask the issuer to expand the claim. Do not silently translate the abbreviation into GWEPT because that is the document the project needs. Preserve the original wording and record the clarification beside it.

Understand why UL 94 does not answer the entire question

TE Connectivity's glow-wire white paper contrasts direct-flame testing with an electrically heated glow-wire source. That difference is enough to reject an automatic conversion between a UL 94 label and a glow-wire result. It does not mean one method is universally more demanding, or that one classification makes the other irrelevant for every equipment standard.

A buyer should therefore request the documents separately whenever the project requires both. Link the material identifier in the flame-classification record to the identifier in the glow-wire evidence. If the names differ, resolve the discrepancy with the manufacturer instead of assuming that two trade names or two colors refer to the same qualified compound.

The existing UL 94 thickness and color guide covers reading that classification in its own context. The purchasing decision here is different: establish which glow-wire evidence route applies and whether the supplier has provided that route for the actual connector. Keeping the questions separate makes each approval easier to maintain when a later substitution is proposed.

Build a part-to-material evidence chain

Start with the full manufacturer part number, drawing revision and proposed color. Record the mating half, contact arrangement and any accessories included in the quotation. Then request the material designation used for the relevant insulating part and the document that links that material to the offered part. A generic resin data sheet is not a substitute for that relationship.

Next identify the test specimen or tested component in each report. Where material data are supplied, retain the specimen thickness and any other stated restrictions. Where component data are supplied, retain the geometry, assembly state and test location information provided by the report. Do not add missing conditions from memory or from a different member of the product family.

Finally connect the evidence to the production identification that will arrive with the shipment. The receiving record should make it possible to distinguish the approved part from a look-alike or a subsequently revised variant. The goal is not to demand disclosure of proprietary formulations to every receiving clerk. It is to maintain an auditable link between an approved identity, an authorized manufacturing source and the goods being accepted.

A useful evidence chain can be short: quotation line, controlled drawing, material declaration, relevant report and change-notification commitment. It becomes weak when those documents disagree or when the report cannot be traced to the quoted line. Resolve that weakness before comparing prices as if all offers describe the same approved item.

Read finished-part evidence without expanding its scope

For a GWEPT report, first locate the part identification and photographs or drawings used to define the test object. Check whether the report concerns a standalone housing, an assembled connector, a header, or another specified arrangement. Those descriptions should come from the report. Procurement should not assume that every laboratory uses “end product” to mean the complete appliance sold to the final customer.

Then compare the report's construction with the quotation. Position count, mounting style, insulating geometry, contact configuration and nearby components may require a coverage decision. The existence of a difference is not automatic proof of failure; it is a reason to obtain the manufacturer's or responsible evaluator's documented rationale. Equally, similarity in appearance is not sufficient evidence of coverage.

The public IEC 60695-2-11 scope also makes clear that the method does not constitute a complete fire-hazard analysis of the equipment. Keep that boundary visible in the approval record. An accepted component result can support a larger equipment evaluation while leaving other safety questions to that evaluation. Avoid changing a test report's limited statement into “fireproof,” “safe in every application,” or an equivalent marketing claim.

Treat material preselection as a defined route

Material data are valuable when the equipment evaluation permits their use in a specified preselection process. Request the relevant material record and the technical explanation connecting it to the component. Ask which conditions must remain unchanged and whether additional component or equipment evidence is still required. This makes the commercial scope explicit instead of forcing the buyer to guess why the supplier has provided a resin card.

The TE white paper, identified as Revision B from November 2018, warns that choosing resin solely from data-card values does not always establish finished-component performance. That manufacturer observation supports a cautious evidence handoff. Its historical appliance flowcharts should not be copied as a universal current approval route; the project must use the applicable standard edition and an authorized interpretation for its equipment.

Likewise, TE's glow-wire connector portfolio page lists material-related features and multiple connector families. It is a starting point for finding candidate parts, not proof that every ordering code, color and assembly option has identical coverage. Ask for the exact product documentation before using a family-level statement in a purchase specification.

Compare three hypothetical supplier submissions

The following example is invented solely to illustrate document review. The part names, dimensions and project criteria are hypothetical; they are not SINAWATTS products, measured test results or requirements taken from an IEC standard. Assume a project reviewer has requested evidence covering the actual four-position housing under a documented component-evaluation route.

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

SubmissionWhat the buyer receivesGap against this hypothetical projectCorrect next action
AA material GWFI record for grade R, plus a quotation saying “V-0 housing”No link from grade R to the offered housing and no agreed component coverageRequest the material-to-part link and route clarification
BA GWEPT report naming a two-position housing; the quote names a four-position versionReport identity differs from the purchasing identityObtain an authorized extension or the necessary evidence for the offered version
CA report naming the four-position revision, with matching drawing and declared materialDocument identity aligns; criteria and remaining equipment conditions still need reviewCheck the agreed criterion and record the responsible acceptance decision

Suppose the material attachment in submission A states a tested plaque thickness of 1.5 mm while the housing drawing includes a 0.8 mm feature. Do not declare failure from that observation alone. Ask whether the material route covers the relevant geometry and how the project reviewer has assessed it. Conversely, do not ignore the difference simply because the nominal body wall is thicker elsewhere. The connection between specimen conditions and the actual design needs an explicit answer.

Submission B illustrates another common purchasing error: selecting a report by a similar product photograph. A family resemblance is useful for locating the right manufacturer contact, but it is not the approval itself. The reviewer may accept a justified coverage argument, request further evidence, or decide that the proposed substitution is unsuitable. The buyer's task is to keep that decision tied to the exact quotation line.

Submission C is the most complete starting package in this example, yet it is not an automatic permission to skip the equipment review. Identity match and compliance with a criterion are separate checks. A report can name the correct product while describing a condition that differs from the project requirement. Record both checks rather than collapsing them into a single green spreadsheet cell.

Make the RFQ deliverables explicit

Ask bidders to return a compact evidence schedule alongside the commercial quotation. Require the offered part number and revision, the relevant material identity, the method and edition for each claim, the report reference, the covered configuration, and any limitations or proposed deviations. Include a field for “not supplied” so missing information is visible rather than hidden in a general conformity statement.

Specify whether the price should include access to existing reports, a technical coverage assessment, or a separately quoted evaluation that has not yet been performed. These are different deliverables. A supplier's ability to quote a connector does not demonstrate that it owns a test laboratory or can complete a particular approval within an assumed schedule.

For a harness project, include the connector and mating arrangement in the custom cable assembly inquiry. If the requirement affects a broader custom assembly, the OEM and ODM service scope is a useful entry point for clarifying drawings and documentation. These links do not imply that a particular glow-wire qualification is available for any unreviewed item.

Send the connector drawing, equipment requirement and requested evidence route with your RFQ. Include the proposed ordering codes and identify the missing documents, so the inquiry can address the actual acceptance question rather than a generic flame-retardancy claim.

Keep technical deviations separate from price comparisons

A cheaper offer may omit a report, use another material, or assume a different approval route. Those differences belong in a deviation register before commercial ranking. Record the requested requirement, the supplier's alternative, the evidence offered, the responsible reviewer and the decision deadline. Avoid a single “compliant” checkbox when the supplier has actually proposed an exception.

Where an assessment or new test is needed, ask for a written scope explaining the samples, responsible organization, deliverables and schedule assumptions. Do not invent a test cost or lead time. Also clarify what happens if the evidence does not support the offered configuration: whether another part will be proposed, whether engineering review is required, and which commercial decisions remain open.

This approach helps purchasing compare complete packages. It does not guarantee that the initially cheaper connector will become more expensive, or that the most expensive bid will be technically best. The defensible comparison is between defined products with defined evidence obligations. Price becomes meaningful after those obligations are visible.

Plan incoming acceptance around traceability

Incoming inspection cannot recreate a qualification program by looking at a housing. It can, however, verify that the shipment matches the approved identity and that the required records accompany it. Check the ordering code, quantity, declared revision, labeling and any lot information required by the purchase agreement. Compare the supplied documentation with the approved evidence schedule.

Keep samples and photographs where the project calls for them, but do not treat color appearance or a hand-performed burn demonstration as proof of the documented classification. If an identity mismatch appears, segregate the affected items under the organization's established process and obtain clarification before release. Preserve the original records rather than editing a supplier certificate to fit the purchase order.

Define how the supplier should report changes in resin grade, material source, colorant, molding configuration or product geometry where those changes affect the accepted evidence. Not every change automatically requires the same evaluation; the technical reviewer should decide coverage. What matters is that the change is visible before an unreviewed version enters an approved assembly.

Preserve the record when an alternative is approved

A substitution decision should identify the old and new ordering codes, the reason for the change, the evidence compared, the accepted limitations and the approval authority. Retain the earlier report because it explains the configuration already built or shipped. Replacing the old document without a history makes later traceability harder, even if the new part is fully acceptable.

Consider a second hypothetical situation: a purchasing team changes a natural-color housing to a black version to match an enclosure. The geometry remains the same, but the material record supplied for the original version does not explicitly establish coverage for the new version. The correct response is to request the coverage decision, not to assume that the cosmetic purpose makes the change technically irrelevant.

The same discipline applies when a supplier consolidates two ordering codes. Obtain the manufacturer's explanation of what changed and which report references remain applicable. Once the responsible reviewer accepts the change, update the purchasing and receiving instructions together. Otherwise a technically approved substitution can still be rejected at receipt because the receiving team is using an obsolete identity list.

Buyer FAQ

Does a UL 94 V-0 claim prove that a connector meets glow-wire requirements?

No automatic equivalence should be assumed. The methods and evidence objects differ. Check the applicable equipment requirement and obtain the requested glow-wire documents for the material or finished part as appropriate. A UL 94 record may still be required separately, but it should not be renamed as a GWEPT report or used to fill a missing evidence field without an accepted technical basis.

Are GWFI and GWIT both finished-connector tests?

They are material-related quantities in the referenced IEC test-method framework. GWEPT addresses an identified end product under defined conditions. Ask the supplier to name the tested object and method in each report. When a quotation combines the abbreviations into one line, separate them before comparing offers so that a material value is not mistaken for a result on the quoted housing.

Can a report for one position count cover another connector in the same family?

Possibly, but the buyer needs an accepted coverage basis rather than an assumption. Request the tested part, proposed part and manufacturer's or evaluator's rationale for the extension. Retain any restrictions. A shared family name or similar photograph is not enough to establish that the report covers every variation in geometry, material or assembly configuration.

Does the highest glow-wire temperature identify the best connector?

Not by itself. First check that the values refer to the same type of evidence and that the required route is satisfied. Then assess the connector's other project requirements separately, including electrical, mechanical and environmental compatibility. A temperature number without its test object, method and conditions is not a reliable basis for ranking otherwise different products.

Must every shipment undergo a new glow-wire qualification test?

Do not invent a universal lot-testing rule. Separate qualification evidence, change review, production controls and incoming acceptance in the purchase agreement. The appropriate frequency and scope depend on the governing requirement and the approved quality plan. Traceability to the accepted construction is necessary, but traceability alone should not be misrepresented as a newly performed destructive test.

Can SINAWATTS guarantee a specific certification, price or completion date from this guide?

This guide does not establish product-specific certification, laboratory capability, stock or commercial terms. Provide the exact connector identity and evidence requirement for review. Any offered documentation, assessment scope, price, quantity condition or delivery schedule must be confirmed in the written quotation. Do not use the guide itself as a certificate for an unreviewed product.

What should I send when the supplier's evidence is incomplete?

Send the drawing or ordering code, the equipment requirement and edition, the received report references, and a short list of unresolved differences. Identify whether the gap concerns material identity, specimen conditions, component coverage or acceptance criteria. This gives the responsible reviewer a concrete decision to make and helps the supplier return the relevant document instead of another general product brochure.

Request a connector package with a clear approval boundary

Prepare the inquiry around the evidence chain: equipment requirement, exact component, material identity, applicable test route and controlled production version. Keep unresolved conditions visible until the authorized reviewer closes them. Send your connector specification and document checklist to SINAWATTS to request a quotation with explicit product and evidence scope, while retaining responsibility for the finished equipment's applicable approval requirements.