Technical Buyer Guide

How to Specify CAN Harness Termination for Every Installed Configuration

Count built-in CAN terminators, specify switchable end nodes, and interpret power-off resistance checks before approving a harness and its service configurations.

Published by SINAWATTS · Last reviewed 18 November 2026 · Editorial and source policy

For a conventional two-wire high-speed CAN trunk, specify the termination at each physical end and count every resistor already inside connected equipment. A cable order that says only “CAN harness, 120 ohms” leaves several questions unanswered: whether the number describes cable impedance or a fitted resistor, whether the equipment already provides termination, and what happens when an end node is removed. Resolve these questions on a network drawing before comparing quotations.

The useful procurement deliverable is a termination schedule covering the assembled network, the bare harness and its permitted service arrangements. A resistance reading can support that schedule, but it cannot establish where the resistors are mounted or prove that communication will work at the intended data rate. This guide explains how to request evidence that connects the drawing, supplied parts and measured configuration.

The scope is a conventional high-speed CAN trunk. Low-speed fault-tolerant CAN, repeater-separated segments, proprietary networks and other physical-layer arrangements need their own equipment instructions. Do not transfer the two-end termination arrangement into an unfamiliar network merely because a connector is labelled CAN.

Put the termination locations on the network drawing

Start with the actual path of the trunk from one physical extreme to the other. Place each node and branch connection on that path, then mark the two end locations. The first item in a software node list might be in the middle of the cable. A device called the master might also be in the middle. Neither label identifies a termination location.

Texas Instruments describes a conventional high-speed CAN interconnect with termination matching the cable's 120-ohm characteristic impedance at the two extreme ends. Its application note also illustrates a controlled switch that enables termination in the two end nodes while intermediate nodes leave their termination disabled. This supports specifying the installed locations and switching states together. TI, Top Design Questions About Isolated CAN Bus Design, section 4

Give the network drawing an identifier and revision. Show the harness connector identifiers, equipment references, optional extension and service connection. Add “termination provided here” at the relevant locations, with the party responsible for each item. A resistor inside customer equipment and a resistor supplied in a loose connector are different purchasing responsibilities even when their electrical function is similar.

Identify the boundary of the cable supplier's responsibility. A supplier may be asked to deliver an unterminated trunk because the two end devices contain the resistors. Another order may require a fixed resistor in one cable end and a removable termination plug at the other. Treat these as different configurations with explicit part numbers. The same label on the outside of a bag is insufficient when the contents change electrical loading.

For cable routing, pair opening and branch dimensions, use the separate CAN twisted-pair, untwist and branch-stub guide. Those properties remain relevant, but buying the correct twisted pair does not resolve a missing or duplicated end resistor.

Build an inventory of every possible terminator

Ask the equipment owner for termination information before requesting the harness quotation. Manuals, wiring diagrams and hardware options are useful evidence. A menu setting labelled “termination” should be tied to its documented electrical function and hardware version. Do not infer resistor presence from a sales description or from a connector cover that happens to look like a termination plug.

Use one inventory row per possible termination position. Record the node identifier, exact model and hardware revision, resistor value, fixed or switchable construction, normal setting and evidence reference. Include external service adapters and diagnostic tools. A temporary diagnostic interface can add a resistor just as effectively as a permanently installed controller.

A practical schedule can stay compact:

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

ItemEvidence to obtainConfiguration decision
Equipment at end AInternal termination value and enable methodEnable it or provide an approved external termination
Intermediate nodeFixed loading and any switchable terminationConfirm the required disabled state
Equipment at end BTermination behaviour with power removedSpecify normal and service arrangements
Diagnostic connectionWhether the adapter adds terminationState the permitted adapter setting
Optional extensionNew physical end and displaced old endRevise both affected end settings

Do not count components without following their circuit. A split termination can use two series resistors that together form one end termination. Conversely, one connector shell can contain a complete additional resistor across CANH and CANL. Count the electrical termination paths across the pair and establish their positions. Count physical resistor bodies separately for the bill of materials.

Where evidence is missing, write “unknown: confirmation required” in the inventory. That is a more useful quotation constraint than assuming all devices are unterminated. The harness can sometimes be quoted provisionally with alternative termination assemblies, but the release drawing should select one accepted arrangement before production starts.

Define switchable termination as a set of states

A switchable end node needs more than an ON/OFF label. Define the normal operating state, the state after power loss, the state during startup and the state after replacement or configuration reset. A mechanical switch, jumper, relay and electronically controlled switch may not behave identically when power is absent. Obtain the instructions for the actual implementation.

For software-controlled termination, specify who owns the setting and how the installed state is confirmed. A saved setting in an application is not automatically proof of the physical switch state during startup. If a resistor disappears while a node is unpowered, a power-off resistance check can give a different result from the operating network. Document that difference rather than treating it as an unexplained harness fault.

Create a small state table for each allowed installation. For example, the normal arrangement might use equipment A and B as the two ends. An extension might move the end from B to C, requiring termination at B to be disabled and termination at C to be enabled. The service arrangement might temporarily remove B and install a terminator at the exposed trunk end. These are illustrative arrangements, subject to the system owner's approval.

Avoid asking a technician to improvise when an endpoint is removed. Specify whether the network must be shut down, whether the disconnected position is permitted during operation, and which replacement or service part maintains the approved configuration. Never assume that fitting a resistor makes hot-plugging acceptable; connector sequencing, software and electrical transients require their own authorization.

Label the relevant parts so that the state schedule is usable away from a desk. Include the harness identifier and endpoint function on a termination plug or service kit where space allows. Use drawing-defined markings when the assembly is too small. If two plugs share the same housing but one contains a resistor, their order codes and identification must make that distinction visible.

Understand fixed and split termination before ordering

A simple end termination places a resistor across CANH and CANL. Split termination divides the resistance into two series parts and connects the midpoint through a capacitor to the designated reference. Its component list and wiring therefore differ from a plain resistor hidden in a connector. A quote should identify which circuit is included.

TI's TCAN33x data sheet illustrates standard 120-ohm end termination and split termination using two 60-ohm resistors with a midpoint capacitor. It also highlights resistor power under fault conditions. The drawing supports identifying the circuit; it does not authorize substituting an arbitrary capacitor, grounding arrangement or resistor package into a particular installation. TI TCAN33x data sheet, sections 7.2.1.1 and 7.2.2

For a split circuit, obtain the two resistor values and tolerances, capacitor specification, reference connection and approved physical arrangement. A catalogue statement of “120-ohm termination” can conceal different circuits. Matching the overall resistance alone does not verify that the midpoint connection is correct or that the intended common-mode behaviour has been retained.

The responsible engineer should specify component power and fault requirements for the application. A resistor that handles normal signalling may face a different load if a bus conductor contacts a supply. Procurement should request the approved component references and evidence behind that choice, rather than selecting a wattage from a generic CAN cable listing.

Mechanical packaging matters too. Resistor leads should not become the strain-bearing element at a cable exit. Request the approved assembly detail for insulation, support and protection from connector backshell hardware. If resin, sleeving or a larger enclosure changes heat removal or repair access, treat the proposal as a design change requiring review. Do not assume a potted resistor can be inspected or replaced by the same method as an accessible plug.

Read power-off resistance as an equivalent circuit

A reading near 60 ohms can be consistent with two 120-ohm terminations in parallel. It does not prove that they are at the correct ends. Resistance is a useful check when the measurement configuration and other connected circuits are understood.

Measurements should be made only by qualified personnel following the equipment's deenergization procedure. Disconnect all relevant sources, including independently powered nodes or backfeed paths, and verify the absence of voltage before using a resistance range. Confirm that the meter's test stimulus is permitted for any electronics left connected. An insulation tester must not be substituted for an ordinary resistance measurement on connected CAN electronics without explicit equipment approval.

For an isolated passive network with negligible wire resistance and no other loading, the simple expectations are:

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Passive arrangementIdeal resistance across the pair
One 120-ohm termination120 ohms
Two 120-ohm terminations60 ohms
Three 120-ohm terminations40 ohms
Four 120-ohm terminations30 ohms
No termination or other conductive pathOpen circuit

These numbers are calculation examples, not universal production limits. Resistor tolerance, conductor resistance, contacts, the meter and attached equipment change the result. The test plan must define the permitted configuration and acceptance range. An unexplained number should trigger investigation of the circuit, not an attempt to fit a resistor until the display reaches 60.

Connected transceivers, protection networks, capacitors and controlled termination circuits can affect what the meter sees. A reading may drift, depend on polarity or differ between equipment states. Such behaviour can require a device-specific procedure. The cleanest way to verify the cable supplier's fixed resistors may be to measure the disconnected harness and then perform the equipment-level check separately under an approved method.

Work through a bounded resistance example

Consider a hypothetical trunk with one fixed 120-ohm resistor at each end. Assume the resistors are exact, other equipment is disconnected and the meter is attached between the two ends. Suppose the resistance of each conductor from the measurement point to end A is 1 ohm, and each conductor to end B is 3 ohms. These are chosen values for arithmetic, not recommended cable losses.

The path through end A then contains 1 + 120 + 1 = 122 ohms. The path through end B contains 3 + 120 + 3 = 126 ohms. The meter sees these two paths in parallel:

Equivalent resistance = (122 × 126) ÷ (122 + 126) = approximately 61.98 ohms.

A purchase requirement demanding exactly 60.00 ohms would reject that idealized circuit despite its two correct resistors. Actual resistor tolerances and the measurement method would need to be added before setting a defensible acceptance band. This example explains why the test point and wire lengths belong in the specification.

For another deliberately simplified case, take two 120-ohm resistors each specified at ±1% tolerance, zero conductor resistance and no other loading. If both are at the low limit, the equivalent is 118.8 ÷ 2 = 59.4 ohms. If both are at the high limit, it is 121.2 ÷ 2 = 60.6 ohms. This interval covers only the assumed resistor tolerances. It is not a finished-harness acceptance band.

The engineer must then include the bounded conductor and contact contribution, temperature effects where material, and measurement uncertainty. Document whether leads are compensated and where probes contact the assembly. If a drawing uses different tolerance parts or includes switch resistance, recalculate the relevant network. Copying the example interval into an inspection sheet without those inputs would discard the reasons for calculating it.

Now imagine two 120-ohm resistors mounted together near the measurement connector, with the far end left unterminated. Ignoring wire resistance, the meter can still indicate 60 ohms. The network topology is wrong even though the aggregate resistance looks familiar. Location must be confirmed by the drawing and assembly evidence; dynamic behaviour requires the system's communication validation.

A third scenario involves a diagnostic adapter that adds another 120-ohm resistor. The ideal reading falls from 60 to 40 ohms when the adapter is connected. The useful corrective action is to identify the unintended third termination and its required setting. Replacing a harness resistor with a different value to restore the aggregate number would leave the configuration problem unresolved.

These examples help separate fault hypotheses. They do not provide a complete CAN diagnostic procedure or establish allowable data rate, cable length, stub length or signal quality.

Compare quotations on the delivered configuration

Two quotations can both say “CAN cable with termination” while supplying different network functions. Ask each supplier to return the same termination schedule with included, excluded and customer-provided items identified. This makes a price comparison meaningful before discussing lead time or assembly options.

For example, offer A might include an unterminated trunk and two removable resistor plugs. Offer B might include two fixed cable resistors. If both end devices already contain enabled termination, neither arrangement can simply be installed as supplied. Offer A might remain usable with the plugs omitted, while offer B might need redesign. This is a hypothetical comparison, not a statement about any vendor's products.

Require the quotation to address continuity, shorts, fixed resistor verification, configuration labelling and traceability. Ask which checks cover every production assembly and which are first-article or equipment-level checks. A report on one prototype does not establish the test coverage of later cable lots.

Use the CAN characteristic-impedance and differential TDR guide when the purchase also requires cable-impedance evidence. A DC resistance check and a transmission-line measurement answer different questions, so the reports should be identified by method and purpose.

For a project involving a custom assembly, the SINAWATTS OEM/ODM service page provides a relevant starting point for discussing scope. Share the network drawing and termination schedule through the project inquiry form. Ask for confirmation of the specific assembly and evidence required; this guide makes no claim that a particular CAN termination product or test capability is available.

Make first-article evidence reproducible

The first-article package should allow another reviewer to understand exactly what was built and measured. Include the approved schematic, wiring table, resistor component references, termination locations, equipment exclusions and a photograph or drawing showing identifying marks. Redact unrelated confidential system details where necessary, while retaining the information needed to assess the supplied harness.

Specify the resistance test points using connector and contact identifiers. Include the meter method, disconnected items, switch states, temperature where relevant and the acceptance limits approved for that configuration. Record the actual result and assembly identifier. A check mark beside “CAN resistance OK” loses information that becomes valuable if the equipment configuration later changes.

Where resistors are hidden inside an overmould or connector, establish the evidence before the assembly becomes inaccessible. The buyer may require a component issue record, assembly-stage image, sample inspection or another agreed process. Choose evidence proportionate to the assembly and its risks; do not assume a visual inspection can verify a hidden component value.

Include a connector-view drawing with the test instructions. A cavity number observed from the mating face can appear mirrored from the wire-entry side. Identify the view, contact numbers and CANH/CANL labels so an inspector can reproduce the connection without guessing. Where the fixture contains its own termination, show that resistor on the test circuit and account for it explicitly.

System validation should use the intended topology and operating conditions under the equipment owner's procedure. Record node count, termination state, cable version and relevant communication settings with the result. Procurement should retain that configuration reference so a later cable substitution is evaluated against the same basis.

Release the production order only after discrepancies between the drawing, inventory and sample report are resolved. If the customer changes an end device during approval, revisit its termination details. A harness can remain physically unchanged while the assembled network acquires a third resistor or loses one of its required end terminations.

Control replacements and later extensions

Replacement orders are a common opportunity for configuration drift. Preserve the distinction between a bare trunk, a trunk with fixed resistors and a service kit containing loose terminators. A purchasing system that collapses all three into “CAN harness” encourages incorrect substitutions.

An approved substitute resistor needs the relevant value, tolerance, environmental and fault requirements, together with the authorized mechanical arrangement. An alternative end device also needs a termination inventory update. Procurement should not approve a device substitution solely because its connector mates or its communication protocol is described as compatible.

For an extension, draw the new physical endpoint and identify which previous endpoint stops being an endpoint. Update the switch settings, service instructions, drawings and supplied plug quantity together. Keep the previous revision available for installations that still use the original topology.

Return information from field troubleshooting to the configuration record. Note whether the questioned assembly was measured alone or with equipment connected, and whether a diagnostic adapter was present. This information can prevent a healthy replacement harness from being modified to compensate for a setting elsewhere in the network.

Buyer FAQ

Should every CAN device contain a 120-ohm resistor?

A device can contain a selectable resistor without that resistor being enabled in every installation. For the conventional trunk discussed here, the design needs the specified termination at the two physical ends. Ask for the hardware inventory and installed settings. A node in the middle must not acquire active termination simply because its enclosure contains an available resistor or a technician enabled a default option.

Does a 60-ohm reading prove that the harness is correct?

No. Two resistors in the wrong location can produce the same aggregate reading as correctly placed terminations. Wire resistance and connected equipment also affect the result. Use resistance as one check against an understood circuit, together with location evidence, correct pin mapping and the system's communication validation. Specify the configuration and limits rather than treating one display value as a complete acceptance test.

What if the power-off reading does not match the powered configuration?

Check the documented behaviour of the termination switch and connected electronics. An electronically controlled resistor may be disconnected when its supply is absent. Do not measure resistance on a powered bus to force a comparison. Request an approved equipment-level method and verify fixed cable components separately where possible. Record the expected power-off result so the difference is not mistaken for an intermittent assembly fault.

Is a split termination interchangeable with one resistor?

The overall series resistance can be equivalent for a basic DC calculation, but the circuit also includes a midpoint connection and capacitor. The substitution affects more than resistor count. Require the approved circuit, component references and connection to the intended reference. A generic 120-ohm plug should not replace a specified split network without engineering acceptance of the electrical and mechanical change.

Can a CAN harness supplier guarantee communication from the cable drawing alone?

The drawing can establish what the supplier is asked to assemble, but the operating result also depends on connected devices, topology, settings and conditions. Define the supplier's evidence and the system owner's validation separately in the purchase documents. Any performance commitment should identify the tested configuration and its boundaries. Avoid accepting an unsupported “works with all CAN systems” statement as qualification evidence.

What information should accompany a quotation request?

Include the trunk drawing, connector pin assignments, equipment termination inventory, allowed configurations, switch states, fixed or removable resistor requirements, environmental conditions and expected inspection records. Ask the supplier to list assumptions and exclusions before quoting. Send the CAN termination RFQ package for a scope discussion, with component availability, testing, price and delivery subject to written confirmation.

A clear termination schedule gives purchasing, assembly and service teams the same reference. It also makes an apparently simple resistance reading useful: each result can be compared with the specific circuit that was intended to be delivered.