A nominal cable impedance does not establish the impedance of a complete CAN harness. For a purchasing decision, ask which assembly was measured, whether the result is differential, where the measurement begins, and which rise time and acceptance window were used. A screenshot without those details can make different assemblies appear comparable when they are not.

The useful deliverable is a traceable evidence package for the proposed harness: drawing identity, connection diagram, test setup, readable result and an agreed interpretation. Procurement does not need to invent a signal-integrity specification. It needs to preserve the requirements supplied by the system designer and prevent a supplier from silently replacing one measurement with another.

This guide addresses characteristic-impedance and time-domain reflectometry evidence for passive differential harness assemblies. It does not prescribe a universal CAN acceptance band, certify a network, or provide instructions for connecting test equipment to an energized installation. Any measurements require suitable equipment, an approved method and qualified personnel. No example below describes SINAWATTS test facilities or measured product performance.

Use four decisions before comparing quotations

  1. Identify the requirement. Obtain the network type, exact assembly drawing and controlling impedance requirement from the responsible designer. A generic phrase such as CAN compatible leaves the acceptance question unresolved.
  2. Match the measured object. Determine whether the report covers bulk cable, a connector, a completed point-to-point assembly or a branched harness. Hold any unexplained substitution between them.
  3. Match the measurement basis. Compare differential mode, fixture treatment, reference plane, effective rise time and evaluation region. Similar-looking traces with different settings are not an adequate price comparison.
  4. Review the applicable result. Apply the agreed limits and decision rule to the correct region, then preserve exclusions and unresolved network-level questions in the release record.

These steps separate missing evidence from a failed product. A quotation can remain commercially interesting while its technical release is on hold. The supplier should know exactly which missing document or clarification would let the review continue.

Define characteristic impedance without confusing it with resistance

Characteristic impedance describes a transmission-line relationship for traveling signals. It is not the same measurement as the DC resistance of a conductor, the contact resistance of a crimp, or the resistance seen across two network terminals by a handheld meter. The units alone do not make those quantities interchangeable.

Texas Instruments' application report SLLA270, published in January 2008, discusses cable characteristic impedance and line terminations as separate parts of high-speed CAN physical-layer design. It is useful historical background for that distinction, not a current compliance specification for every CAN variant. Use the applicable current system requirement for the actual purchase. TI, Controller Area Network Physical Layer Requirements, sections 4.2 and 4.5.

For an RFQ, create separate fields for cable impedance, termination components, conductor resistance and the assembly evidence requested. If a supplier answers an impedance question with a resistance reading, ask what was connected during that reading and which question it actually addresses. Do not reject useful continuity data; keep it under the correct heading.

The existing CAN twisted-pair, untwist and branch guide addresses construction and topology. This article adds the measurement-evidence layer. A controlled drawing and a traceable electrical report support one another, but neither should be replaced by a generic pass label.

Separate bulk cable evidence from complete assembly evidence

A bulk cable datasheet describes the cable under its declared conditions. A finished harness adds terminations, connectors, transitions, branches and possibly components. Ask the supplier to identify which of those features are included in the offered measurement. A cable manufacturer's number should not be relabeled as a test result for an assembled harness.

Start with a diagram that names the two conductors, connector cavities, measurement direction and all branch ends. Record the exact cable identity, drawing revision, connector and contact variants, termination construction and relevant assembly length. Where multiple specimens were tested, preserve individual serial or sample identifiers.

Identify which assemblies the evidence is intended to represent. A report on a development sample may be valuable, but its connection to production needs a controlled construction record. If production changes an approved cable, connector or termination arrangement, ask whether the previous evidence still applies rather than transferring approval through the family name alone.

For the mechanical definition, use the harness length and datum guide. Electrical distance on a trace and the dimensions on a drawing are related through a measurement interpretation; they are not automatically the same coordinate system. The reviewer needs a stated mapping before assigning a feature to a physical location.

Ask what the TDR trace actually represents

Time-domain reflectometry, or TDR, uses a changing stimulus and the returned response to examine impedance discontinuities along an interconnection. Tektronix's application note explains the dependence of impedance measurements on the reference impedance and discusses differential measurements, channel alignment and filtering. Its worked examples include interfaces other than CAN; their acceptance values must not be imported into a CAN harness requirement. Tektronix TDR application note, 55W-14601-2.

For a differential pair, ask for the differential measurement definition and channel mapping. A single-ended trace on one conductor does not by itself answer every differential-impedance question. Conversely, a differential trace can conceal information that a separate balance or common-mode investigation may need. The system engineer should specify the required outputs rather than procurement ordering every available plot without a purpose.

Request the plotted quantity, units, time origin and conversion settings. A trace in reflected amplitude should not be treated as if it directly displayed impedance in ohms. A software label saying impedance still needs a documented reference and method.

Keep acquisition and display settings with the data. A cropped screenshot may remove the very feature that explains an excursion. Ask for a full trace plus a readable view of the evaluation region, with sample identity and setup revision on both. Where an editable data file is required, specify its format before commissioning the work.

Make the fixture and reference plane visible

The measurement connection can include instrument cables, adapters, breakout boards and mating connectors. Draw those items separately from the purchased harness. Mark the reference plane: the defined boundary to which the measurement is referenced. Without that boundary, a feature near the start of the trace may be attributed to the harness when it belongs to the connection setup.

Keysight's FlexDCA calibration documentation explains that TDR calibration establishes the reference plane and can include adapters and cables up to that plane. It also distinguishes instrument module calibration from the TDR setup calibration. This supports asking for both the equipment status and the measurement-specific setup, rather than accepting a calibration sticker as a complete description of fixture treatment. Keysight TDR Calibration Setup.

Ask the laboratory to state which fixture effects remain in the reported result and which were corrected or removed. Do not assume that a setting called deskew performs every correction available in a full calibration. Keysight lists deskew, loss-compensation and full-calibration options separately in its instrument documentation. Keysight Performing Error Corrections.

A purchasing review should record the selected technique and its applicability, not instruct an operator to choose the option that produces the smoothest trace. If a fixture model or correction file is used, retain its identity and the evidence that it belongs to the actual fixture revision. A valid method on the wrong breakout board leaves an applicability gap.

Preserve rise time and processing before comparing two plots

The same interconnection can be displayed under different effective stimulus rise times and processing settings. Therefore a comparison should state the rise-time definition and setting, any filtering and the required measurement bandwidth or method. Do not allow an unexplained processing change to become a product improvement claim.

Keysight's TDR setup guidance identifies an effective rise-time setting and notes its use in matching the expected signal's rise time. That is a method consideration, not a universal requirement to choose a particular number for CAN. The applicable design or test specification should determine the setting. Keysight TDR Setup.

Ask for the unambiguous test state: selected response, rise time, averaging or filtering where relevant, and the software or method revision. Keep the setup with the result so a later batch can be evaluated on the same basis. Merely copying the vertical scale from an earlier screenshot does not reproduce the measurement.

If the supplier proposes a different setting, ask for a technical explanation and an approved comparison before changing the requirement. A revised measurement may be appropriate, but the decision should be visible. It should not be a quiet adjustment made after a sample produced an inconvenient feature.

Agree the evaluation region and treatment of transitions

A harness trace can contain a launch region, a length of cable, connector transitions and a far-end response. The project must define which region is evaluated against which requirement. One broad average can hide a local excursion, while an unqualified maximum can include a feature outside the intended acceptance region.

Ask the reviewer to define start and end boundaries using a reproducible reference. If a separate transition allowance or exclusion is permitted, record its source and exact extent. Do not create an exclusion window after viewing an unfavorable result unless the authorized technical process explicitly approves and documents that change.

Record how a short feature is assessed. Its peak, width and location may matter differently under different requirements. This guide does not choose a tolerance, duration or excursion allowance. It asks the supplier to identify the controlling rule and demonstrate that the rule was applied consistently.

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Evidence fieldRequired return informationWhat an incomplete answer leaves open
Measured objectDrawing, sample and included componentsWhether the report covers the ordered assembly
Measurement modeDifferential definition and channel mappingWhether the plotted result answers the pair requirement
Connection setupFixture diagram and revisionWhich response belongs to the fixture
Reference planeDefined boundary and treatment of adaptersWhere the DUT evaluation begins
Stimulus and processingRise time, filters and method settingsWhether two traces are comparable
Evaluation regionStart, end and any approved transition ruleWhether a reported minimum or maximum is relevant
Result and decisionIndividual traces, limits and decision ruleWhether the stated acceptance follows from the data

Use the matrix as a quotation return schedule. A blank field is a clarification item, not an invitation to insert a presumed default. This keeps the commercial comparison tied to an explicitly stated evidence scope.

Worked comparison: a nicer trace can be a weaker offer

Consider three hypothetical offers for the same point-to-point harness drawing. For this illustration only, the buyer's approved requirement specifies a differential impedance window from 110 to 130 ohms over a defined cable region. These numbers are invented to explain document review. They are not recommended CAN limits or measured supplier results.

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Hypothetical offerReported resultSetup informationInitial decision
ARegion minimum 116 ohms, maximum 126 ohmsRequired mode, rise time, reference plane and region documentedContinue to full acceptance and uncertainty review
BRegion minimum 119 ohms, maximum 122 ohmsDifferent filtering; evaluation boundaries missingHold comparability despite the narrower displayed spread
CRegion minimum 108 ohms, maximum 126 ohmsMatching method and identified regionRefer the out-of-window minimum for the agreed disposition

A's displayed span is 10 ohms, while B's is 3 ohms. The smaller span does not establish better manufacturing because the measurement bases differ. C's minimum is 2 ohms below the invented lower boundary; that arithmetic does not determine root cause, authorize rework or replace the agreed decision rule.

For Offer B, request the original setup file, the approved evaluation markers and a result produced under the required basis, or a justified alternative approved by the responsible engineer. Keep the initial record. Do not replace it with a new screenshot and erase why the comparison was questioned.

For Offer C, identify whether the feature is reproducible, whether the specimen and fixture match the report, and what the authorized review concludes. The buyer should not prescribe changes to pair geometry from a single trace. A measurement discrepancy needs a controlled investigation, not an undocumented production adjustment.

Treat branches and far-end states as part of the specimen

A branched harness cannot be described fully by the cable part number and total length. Show each branch and the state of each accessible end during measurement. State whether an end is open, connected to a specified termination, or attached to another identified part of the setup. Keep those states with the trace.

Do not treat a measurement on an isolated trunk as if it included every production branch. Equally, do not impose a point-to-point interpretation on a branched assembly without a method suitable for that object. The responsible signal-integrity engineer should define the measurement and what conclusions it can support.

Where measurement from both ends is useful or required, identify each direction and connect the traces to the same physical drawing. A feature's displayed position will depend on the selected origin and propagation interpretation. Procurement should ask for a labeled correspondence instead of guessing which connector produced it.

The pinout and cavity-view guide helps keep the pair mapping consistent between drawing, fixture and report. A correct instrument setup connected to the wrong cavities can produce a well-formed graph that answers the wrong purchasing question.

Map a trace feature to the drawing before naming a fault

Request a short coordinate record whenever a report assigns a trace feature to a physical connector or branch. The reviewer needs the measurement origin, axis convention and propagation assumptions, not just a cursor position copied into a photograph.

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Mapping fieldSupplier or laboratory return
OriginReference plane and identified drawing endpoint
Horizontal axisTime or converted distance, with units; whether timing represents a round trip or a one-way convention
Conversion basisApplied propagation velocity or dielectric assumption, its source and the configuration to which it applies
Known landmarksCorrespondence between identified assembly features and the trace, including fixture boundaries
Interpretation limitUnresolved features, resolution limits and alternative explanations requiring review

These are proposed reporting fields, not a universal accuracy claim or a request to alter the instrument's method. The Tektronix application note discusses physical-distance interpretation and limitations in resolving nearby discontinuities. A purchaser should therefore retain the method behind a location estimate instead of assuming every visible peak identifies a unique component.

If the record cannot reliably separate a connector transition from its fixture or an adjacent feature, describe the location as unresolved. Even a well-supported location does not prove a manufacturing root cause. Route the finding to the authorized technical investigation before requesting rework or assigning supplier responsibility.

Turn a qualification report into a repeatable supply control

Decide what the initial evidence establishes and what repeat orders require. A first-article report may support approval of a construction, while incoming checks verify identity and specified characteristics. Do not call every repeat-order document a new qualification test when no new measurement was performed.

If ongoing electrical testing is required, agree its scope, sampling or coverage, method and record retention before ordering. A prototype investigation and a production test can use different equipment or cycle times; any claimed relationship between them needs technical approval. A faster production check is not automatically an equivalent replacement for the qualification method.

Record changes to cable source, connector, termination geometry, breakout fixtures and test processing through a controlled review. Not every change necessarily requires the same work, but the applicability decision should identify the change and its owner. The report for a previous construction must remain available as history.

For other electrical checks, use the harness continuity, insulation and withstand guide. Those tests serve different purposes. An impedance report does not replace pinout verification or establish insulation performance, and a continuity pass does not establish signal integrity.

Price the evidence deliverable separately from the harness

Send the proposed drawing, network requirement, existing cable documents and the evidence matrix with the RFQ. Ask suppliers to distinguish the price of the assembly from document review, fixture development, outside laboratory work or other proposed services. No particular supplier capability should be assumed from a catalogue category.

Specify the required return package: controlled setup diagram, sample identities, method settings, evaluation boundaries, result files, an exception list and the technical approval route. Agree what can be shared publicly and what requires a controlled review. Confidentiality can justify an access arrangement; it does not justify an untraceable pass claim.

For a connection-assembly discussion, use the OEM and ODM service enquiry. Provide the drawing and the intended measurement scope rather than asking for a generic certified CAN cable. Availability, testing arrangements and commercial terms need confirmation for the exact request. Send RFQ.

Ask for schedule milestones tied to deliverables: drawing clarification, fixture approval if needed, sample availability, report review and disposition. Keep them as requested or confirmed milestones, not promises copied from another purchase. A low unit price may exclude the evidence work that your release process actually needs.

Buyer FAQ

Does a nominal 120-ohm cable label prove that the finished harness passes?

No. It describes a cable claim under its stated conditions. The completed harness includes additional features and needs evidence appropriate to its drawing and acceptance requirement. Verify the applicability of the cable data and identify what assembly measurements or other engineering evidence the project requires.

Can a handheld resistance reading replace differential TDR?

It answers a different measurement question. A resistance reading depends on what is connected and does not by itself describe the time-domain impedance profile of the pair. Retain it where useful for termination or continuity review, but do not relabel it as a characteristic-impedance report.

Should we always demand the fastest available rise time?

No universal choice follows from the instrument's maximum capability. Use the method and setting appropriate to the controlling requirement, and preserve that basis in comparisons. A changed rise time or filtering setting needs an approved rationale before results are treated as equivalent.

Does a fixture calibration remove every effect of the test connection?

That depends on the technique, reference plane, configuration and valid correction data. Request a statement of what is included, corrected and still present. A general equipment calibration certificate does not explain all measurement-specific fixture treatment.

Can a trace from one harness length cover every length in the range?

Only with an accepted applicability rationale for the requested constructions and requirements. Do not infer family coverage merely because the same cable is used. Identify the length variants, connector arrangements and branches covered by the evidence and preserve any exclusions.

Does a passing impedance report guarantee error-free CAN communication?

No. It addresses one aspect of the interconnection under stated conditions. Network operation also depends on the complete design, components, timing, terminations and environment. Keep the assembly evidence connected to the system validation plan without presenting it as a universal communication guarantee.

What should purchasing do when a supplier cannot supply TDR evidence?

Record the gap and ask the technical owner what alternative evidence or evaluation is acceptable. Clarify whether a sample purchase is for investigation or whether production release is being requested. Do not imply that SINAWATTS or another supplier has unconfirmed equipment, certification, test capacity, stock, pricing, MOQ or lead time.

Release the measured configuration and retain its limits

The final purchasing record should connect one controlled harness configuration to one accepted evidence basis. Include the measurement mode, setup revision, reference plane, rise time, evaluation region and result reference. State the remaining system questions and the changes that require another review.

A good report makes the purchasing decision easier to reproduce. It does not need an impressive-looking plot divorced from its conditions. Send the drawing, controlling impedance requirement and unresolved evidence rows for a scoped response. Send RFQ.