Approve an alternate PV bypass diode when the supplier can connect the proposed device, its mounting and the offered module to an accepted engineering assessment. A matching current rating and a successful function check leave an important question open. When shade clears after the diode has been carrying current, can the hot diode shed heat as it returns to blocking voltage? Ask for the evidence addressing that transition and for a shipment record that identifies which construction was built.
A buyer might first hear about this change in a short email promising an equivalent device to keep a module order on schedule. The module name, rated power and outside appearance may be unchanged. An internal junction-box revision can change the device or its heat path while the box still occupies the same space on the module. A good response leaves useful options on the table. The buyer can release an unchanged lot, consider the alternate against defined evidence, or request separate offers for the two builds.
Identify what happens when the shade clears
A bypass diode provides a path around the group of cells across which it is wired. In a suitable partial-shading condition, current can flow through the diode in its forward direction. The diode dissipates heat. When the cell group recovers and the diode goes back to blocking, the junction may still be hot. A Schottky diode also carries some leakage current under reverse voltage, and its electrical behavior depends on temperature. If increasing temperature makes reverse losses rise faster than the mounted assembly can dissipate that heat, the temperature can continue rising. This is the thermal runaway that matters to the change review.
The object being bought is the module assembly. A semiconductor supplier can characterize its device in a known package and mounting arrangement. The module maker must also understand the path that takes heat from the device into the surrounding construction. A package pad, soldered attachment or other thermal connection can matter even when the circuit diagram is unchanged. An outside photograph of a lid provides little evidence about that path. Ask the supplier for the controlling drawing or a construction identifier that can be traced to it.
The public scope of IEC 62979:2017 deals specifically with the mounted bypass diode as it changes from forward to reverse bias. It identifies Schottky devices as especially relevant to this evaluation. A declaration covering only a loose component needs a further explanation before it can support the mounted assembly. Ask which sample represented the proposed build and who established the link. The IEC publication describes a test method; its existence does not establish that any item in the quotation passed it. IEC 62979 publication record
A useful way to read the underlying engineering is to follow the initial temperature into the transition. University of Central Florida researchers related the operating junction temperature under forward bias to current and the thermal resistance of the diode and junction-box system. Their study developed and checked a model for susceptibility to runaway. For a purchasing review, the practical consequence is to retain the operating and mounting conditions along with a component comparison. The study supplies no universal acceptance temperature for a buyer's unexamined module. UCF research record
Separate four records that can all say pass
A supplier may send a drawing, a component qualification, an electrical production record and a module test report in one folder. Search each for its specimen, the question it answers and the limits on using it elsewhere. Record that information in the bid sheet before transcribing any verdict. A purchasing system that has only one field for “diode test passed” invites a later team to treat unlike observations as interchangeable.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Evidence in the bid | Decision it can inform | Detail to request |
|---|---|---|
| Junction-box component report | Whether the box design was assessed for the stated requirements | Box revision, installed diode options and report scope |
| Module bypass diode thermal test | How the installed device behaved during the stated thermal assessment | Specimen identity, operating condition and basis for the junction-temperature evaluation |
| Module bypass diode functionality result | Whether the specified functional observation was obtained at its place in the sequence | Method, prior conditioning, specimen and result for each position assessed |
| Mounted transition evidence | Behavior when a previously conducting device returns to reverse bias | Assembly, initial state, imposed reverse condition, response and decision |
IEC 62790:2020 covers junction boxes for use on PV modules. Its published changes include a bypass diode thermal procedure and a separate reverse overload current procedure. A certificate or report referring to this standard may be valuable for the box in the offer. Check which box, which revision and which fitted components were covered. Ask the module manufacturer how the particular box is used on its assembly. Treat the reverse overload entry and the forward-to-reverse thermal transition as separate questions when reading a report index. IEC 62790 scope and changes
IEC 61215-2:2021 sets out test procedures within module design qualification. There is a useful public example in TÜV SÜD report 704062300251-00, part 1. Its thermal assessment is followed by a distinct Table 10 for MQT 18.2 functionality. In that table, the marked method uses shaded current-voltage behavior, and the rows identify the response at each of three diode positions on the identified specimen. A later table concerns functionality following hot-spot endurance. The table names and sequence tell a buyer what the observation represents. The public example applies to that report's specimens alone. IEC 61215-2 publication record · TÜV SÜD report, Tables 09–10 and 11.8
Give each installed position a row on the change record and enter its box identifier, diode code, representative specimen and acceptance reference. For example, Table 10 reports three turn-on results for sample HA2023TL-0093-004X. Suppose a subsequent engineering change fits an alternate only in the middle box. The other two positions can keep their original identifiers. For the middle row, obtain the mounted transition assessment or an approved engineering extension that covers the change before releasing the new build. This preserves the original three-position result while making its coverage visible.
Now consider a production sheet with a check mark for diode function. Ask what the factory observed, at what assembly stage, with which identifiers and under what release procedure. This record can help establish that the shipped module cleared an agreed production check. A production result taken with a different method or without the conditioning sequence should carry its own name. Copying a qualification test label onto the production sheet makes it harder to see which evidence still needs to be obtained.
Trace the construction from purchase line to specimen
Start with the old and proposed manufacturer part numbers, suffixes and package descriptions. Ask whether the change affects one diode position, an entire set, a bare die inside a purchased box or a whole replacement box supplied under a new revision. If the diode is part of a sealed subassembly bought by the module factory, the most useful externally traceable identifier may be the box assembly code. Ask the box supplier to maintain the internal device mapping and state who can verify it when a change occurs.
Next record which modules and options use the affected construction. A family may contain different current classes, cell interconnections or box layouts under closely related names. Obtain a diagram with enough detail to associate the diode under review with the relevant cell group. The label on the module gives useful nameplate information but does not identify the voltage across an individual bypass diode in every condition. Ask engineering to identify the relevant forward current and reverse voltage assumptions and the origin of each assumption.
Then follow the heat path. Request the package mounting arrangement, conductor or support geometry, attachment process, and relevant enclosure or filling options. If the supplier considers the alternate thermally equivalent, have it identify the comparison behind that statement. The same package outline can simplify assembly while leaving questions about the internal path or the condition at its mounting surface. Proprietary dimensions can remain in a controlled annex if the responsible reviewer verifies them and refers to a stable annex revision.
Check the sample's relationship to the offered construction in both directions. From the quote, a reviewer should be able to find the matching module and box in the evidence file. From the test report, another reviewer should be able to say which current purchase lines the sample represents. A generic “family covered” stamp cannot answer both questions unless the approved family boundaries are available. Under a contract with several power classes, the answer may release one class while holding a second for assessment.
For an original order that included cable leads, connectors or module accessories, use the junction-box and electrical-tail buying guide to preserve those separate BOM decisions. When the commercial scope includes private-label modules or accessories, identify the named party that controls the hidden construction in the OEM and ODM project scope. The commercial label on the finished product may be different from the name on the underlying assessment.
Compare forward loss and reverse leakage at stated conditions
A headline forward-voltage number can make an alternate attractive. A lower forward drop at the same current and junction temperature corresponds to less forward conduction loss at that operating point. For a reverse-biased device, reverse voltage and leakage current determine the corresponding electrical loss. Compare the conditions given for each figure. A typical curve taken at room temperature and a maximum value quoted at an elevated junction temperature answer different questions. Preserve units, temperature, current or voltage, and whether the figure is a limit or a typical observation.
STMicroelectronics' application note AN3432 gives a worked PV example using the forward and reverse behavior of specific devices together with a junction-box thermal assumption. At 25 V reverse bias and an 85 °C junction, ST calculates reverse losses of 0.014 W for STPS2045C and 0.13 W for STPS20L45C. Figure 9 shows how the difference changes with junction temperature. A purchasing comparison needs both coordinates to make these numbers meaningful. Section 4 illustrates how a manufacturer evaluates a hypothetical design envelope using electrical and thermal quantities. A buyer can reuse that comparison structure while requesting data applicable to the new part. The numerical envelope for ST's example belongs to that example. STMicroelectronics AN3432, Figure 9 and section 4
For a simple arithmetic illustration, assume two hypothetical candidates show forward drops of 0.35 V and 0.30 V at the same 10 A and the same junction temperature. The corresponding instantaneous forward losses would be 3.5 W and 3.0 W. At a separate hypothetical reverse operating point of 20 V and a stated hot junction temperature, leakage of 5 mA and 25 mA would correspond to 0.10 W and 0.50 W. These invented inputs illustrate the comparison, and the products of current and voltage can be checked directly. Neither candidate has been tested or rated by this example.
The comparison shows why the buyer should request both sets of characteristics. It cannot predict the actual temperature at the switch or the later temperature trajectory. In the example, the lower forward loss may change the temperature reached before the transition. The quantity of heat that can then leave the box also depends on mounting and surroundings. Ask the designer what starting condition it used and what technical evidence supports the resulting decision. A comparison reduced to which side has the lowest single wattage has lost that information.
Read the transition record before approving the substitute
First read the record header. Identify the method and edition, laboratory or engineering authority, specimen code, construction reference and test date. Find the drawing revision that relates the tested sample to the proposed substitute. Separate a witnessed test of the proposed construction from a calculation using vendor parameters or a report on a similar box. A well-supported engineering comparison may be acceptable under the contract, but its assumptions should be visible to the person authorizing release.
Next look for the boundary between the two electrical states. Ask which diode position was carrying forward current, how the prior thermal state was established, when the electrical condition changed and what reverse condition was then applied. A graph with “time” on one axis and “temperature” on the other leaves a reader guessing if neither the transition nor the measured point is identified. Establish whether a temperature represents the junction, a case, a nearby conductor or another location. Where the junction value was inferred, ask for the stated basis.
Read the result against its stated acceptance criterion. Keep the recorded response, the decision and the exact specimen together on the same evidence line. A sharp change in a plotted signal could reflect a change in the electrical boundary or in the measurement method. If the trace is hard to interpret, request a signed explanation or the relevant report page from the laboratory. Purchasing staff need enough detail to identify the decision, while metrology and qualification specialists resolve interpretation of the method.
Consider a hypothetical substitution involving two split junction boxes. The supplier provides a transition assessment for the first box but supplies only a component datasheet for the second. Its engineering note says both contain the same diode. Ask what establishes that the tested position covers the second box's mounting and thermal conditions. If the mounting, conductor geometry or approved module configurations differ, have the assessment owner explain the extension and identify what further evidence is needed. This question may narrow the open issue to one position instead of holding every model in the order.
For a covered alternate, put the cross-reference on the order in a form such as “module revision [ ], box revision [ ], sample [ ], assessment [ ], permitted production range [ ].” If the proposed box appears only on the manufacturer's comparison drawing, record who accepted that comparison and which design or test record it extends. If the record names only the original part, leave the alternate on hold. A purchaser can approve the report deliverable while keeping the unreviewed build closed for shipment.
When evidence is restricted, request a redacted page with sample, method and conclusion plus a signed mapping to the controlled internal drawing. An approved independent reviewer might instead verify the full report and issue a scoped coverage statement. Agree in advance which arrangement the contract permits. A document stripped of all specimen identifiers offers little purchasing protection regardless of how impressive its test plots look. Send the original and proposed box codes, module revision and available report headings with your RFQ.
Decide what may ship during a change
Separate the design decision from the inventory decision. List the last identified old-construction lot, the earliest possible new-construction lot and any mixed or uncertain interval. A factory may have procured incoming boxes under one commercial order and used them across several module orders. Ask how the receiving lot of the box was linked to module serials during assembly. If that mapping defines a range rather than a unique serial, record the range and the basis for treating it as a group.
Suppose a distributor holds three pallets under one module model code. In this hypothetical example the packing list links one pallet exclusively to the previously approved construction, one to the alternate, and one to an interval covering both. The distributor asks to release all three against the original model certificate. Evaluate each offer line. The old-construction pallet can follow its established release process when the mapping is credible. The alternate pallet needs the change decision. Hold the mixed interval for identification or another disposition agreed by the responsible parties.
For work already approved, capture the decision in a form that can follow replenishment orders. It should say which diode and box combinations are allowed, effective serial or lot ranges, applicable module revisions, the responsible authority and the records that receiving can expect. A review of one trial sample does not automatically authorize multiple unlisted alternates. If the purchaser accepts a one-time deviation, give it a defined quantity or lot range and an expiry condition so that the next purchase order does not silently inherit it.
IEC TS 62915:2023 provides a framework for evaluating modifications to previously assessed PV module designs and the associated retesting. The IEC describes typical modifications and recognizes a role for engineering judgement. Request the manufacturer's assessment against the specific change and applicable approval route. Depending on the contract, the relevant certification body may need to confirm coverage. A distributor's assurance that the wattage and warranty length are unchanged cannot make that determination. IEC TS 62915 publication record
A shipment delay can also change what the buyer needs to buy. Ask bidders to identify the price and schedule basis for unchanged stock, an alternate covered by existing evidence, and an alternate requiring additional assessment. Agree who pays for any new evaluation, what report the buyer will receive and who decides whether its result closes the gap. A conditional quotation is useful even when a factory cannot give a final release date yet. Keep that commercial condition visible until the technical owner accepts the evidence.
Keep the approval usable at receiving and in service
Provide the receiving team with a short checklist that refers to identifiers available without dismantling a finished module. That may include model suffix, module serial range, box marking where accessible, packing record and approval reference. If a box marking stays the same after an internal change, ask the factory to supply another traceable identifier. The physical check should be compatible with the approved handling and warranty instructions. Asking stores to open a sealed box merely to find the die designation would create a new problem.
Agree what happens if physical markings and paperwork disagree. Record a photograph of the visible marking and the intact shipment label, identify the affected modules and ask for the production record corresponding to those serials. Maintain a distinction between a mismatch in the packing record and an actual unapproved part. Both need resolution, but the route to resolution differs. A corrected packing list can close a clerical discrepancy if supporting evidence is sound. It cannot supply assessment of an electrically or thermally different construction.
Field reports require similar care. A service record might describe a module with reduced output, a hot enclosure or a bypassed cell group. These observations deserve investigation and are not specific enough to identify the failure mechanism. Preserve the serial, installed position, date, operating conditions, technician observations and available change history. Have the responsible service organization determine the appropriate next action under the manufacturer's instructions. Keep the question of repairability separate from the technical qualification of the originally supplied module.
When a change affects other parts of the module, send those questions to the appropriate reviewer. The module bill-of-materials change guide deals with configuration changes outside the diode. If the claimed evidence is a cell hot-spot report, use the hot-spot endurance guide to identify what was assessed. Related observations can help a reviewer assemble the history without giving a test more scope than it actually has.
Buyer FAQ
Is the same maximum current and reverse voltage enough for an alternate?
Use those ratings as screening inputs. Compare the applicable conditions, forward drop, hot leakage behavior, package and mounted heat path, then ask how the engineering assessment covers the offered diode and box. A rating listed for a specific case temperature or mounting condition cannot be assumed to apply identically inside any enclosure. The final comparison should identify the configuration and the party that approved it.
What is the difference between MQT 18.1 and MQT 18.2?
The thermal assessment addresses the heated operating condition, while the functionality assessment addresses a specified functional observation at its point in the qualification sequence. Ask for the relevant pages showing how the report identifies each specimen and result. For thermal runaway at the forward-to-reverse transition, ask which specific transition evidence the reviewer used. A routine production check should also be identified by its actual method and purpose.
Can the supplier use an existing report on a related module?
Yes, if the responsible authority accepts the relationship under the applicable requirements and identifies exactly which variants are covered. Ask for a comparison of cell-group configuration, diode, box and mounting arrangement. A report on a related model can be a practical starting point. A clear trace from the report specimen to the proposed build lets purchasing distinguish valid family coverage from a list of similar model names.
Does every delivered panel need a thermal runaway test?
Specify qualification, production control and shipment documentation separately. A transition assessment on a defined design and a routine inspection plan for production answer different purchasing questions. Request the agreed checks and traceability for the delivered units, then define the events that reopen the design assessment. Changing inspection frequency should not silently change either the technical acceptance rule for the design or the evidence needed for a substitution.
Can the manufacturer keep its semiconductor source confidential?
A controlled internal identifier may be workable if an authorized reviewer can verify the exact construction and the contract allows the arrangement. Require the identifier to distinguish alternates, survive through the production records and trigger notification when the assessed configuration changes. If nobody outside the immediate production operation can verify the mapping, ask for an independent confirmation or price the approved unchanged build separately.
Should we replace a diode on an installed module if a spare looks identical?
Ask the module manufacturer or authorized service organization for the permitted remedy for the model and serial number. Some procurement decisions concern a complete replacement module or box assembly. A loose part matching a marking does not establish that a field intervention restores the assessed construction, sealing or warranty status. Retain the original failure record and written service disposition with the replacement identification.
What should go into a first quotation request?
Provide the original and proposed module and box identifiers, expected shipment split, available diode reference and the decision your engineering team needs. Ask the supplier to identify its covered evidence, any open technical questions, and how the released construction will be traced to serials. Request separate quotations for the approved build and the proposed substitution if the evidence, availability or approval work differs between them.