Release the connector and the board together when their drawings agree on the compliant pin, the finished plated hole and the depth at which the two engage. Ask the board maker to identify the applicable drill and plating controls. Ask the assembler how it will support the board and establish that the connector has seated. A connector that matches the hole pattern on screen can still require a different barrel construction from the one included in the PCB quotation.
This decision arises when a control board, its press-fit header and the attached cable assembly are purchased from different businesses. The connector vendor can supply the ordered part without ever seeing the board. The board shop can supply precisely the drilled pattern it was given without knowing which holes will receive a compliant termination. A buyer can close that gap with a single marked interface drawing and two written confirmations before authorizing tools or production inventory.
Identify which part of the pin makes the connection
A press-fit termination has a working section intended to engage the wall of a prepared hole. For a compliant design, that section deforms as it enters the hole. The connector drawing may also show a slender lead-in, a shoulder that belongs above the board, mechanical retention features and tails serving other functions. Use the manufacturer's cross-section to identify the part that is intended to engage the plated wall. A dimension across the tip is easy to measure but may have little bearing on the required bore.
Write the complete connector code, board revision and mounting side in the RFQ. Give each hole type a distinct mark on a component-side view. If the connector includes ground pins, guide posts or hold-downs, check whether their holes follow the same specifications as the signal pins. Include the board orientation used in the assembly drawing. A pattern that appears symmetrical when viewed from the front can put a support tool on the wrong side of an asymmetric connector housing.
Identify whether the supplier is quoting bare hardware, a connector installed into a supplied board, or an assembly with boards bought on your behalf. Put any mating harness on a separate line. A successful press-in operation concerns the joint between the board and the installed connector. The force required to mate that connector to the harness is another measurement, with its own fixtures and acceptance questions. The mating and unmating force guide can help when that second measurement also belongs in the purchase.
A helpful scope reference is IEC 60352-5:2020. It covers solderless press-in connections and the assessment of their suitability under specified mechanical, electrical and environmental conditions. Its public description gives the buyer a way to identify the connection technology and request pertinent test evidence. Asking for the standard number alone leaves the board, pin, tool and operating conditions unidentified. If a bid cites qualification to the standard, ask what specimens, configuration and report the claim actually covers.
Compare the drill callout with the finished bore
Locate three things on the board information supplied to the shop. Find the hole symbol used by the designer, the drill tool required by the connector specification where one is specified, and the finished hole condition that must receive the pin. They can all appear in a conversation as “hole size.” Add column headings and units before copying a number. If two suppliers give the same number under different headings, their offers still need reconciliation.
An original connector document shows the importance of that distinction. Section 4.2 of Amphenol's HD Express TB-2382 routing guidelines describes the signal and ground press-fit holes for a specific compliant pin associated with a 0.35 mm drill. Its table and accompanying notes distinguish drill size, wall copper, finish and finished inside diameter. They also distinguish required characteristics from typical finish values. A buyer using this family should request the row for the actual selected finish and the corresponding customer use drawing for hole locations.
Take the electroless nickel/immersion gold (ENIG) row in Table 1. It gives copper on each wall of 0.0254 to 0.0635 mm and a finished bore of 0.27 mm with a tolerance of ±0.04 mm. A shop proposing the listed 0.37 mm drill in place of 0.35 mm should identify it in the quote. Footnote 5 calls for factory consultation because that choice can affect impedance. Footnote 3 also treats nickel thickness for ENIG as a requirement. Ask the shop which inspection record covers that layer before accepting its generic ENIG declaration. These dimensions belong to this HD Express configuration.
In that same document the working zone has an explicit location. It also describes an allowance outside that zone for certain applications, and constrains where back drilling may occur. That detail changes what evidence is meaningful. A measurement at an accessible mouth of the hole cannot automatically establish the barrel diameter at the section that engages the pin. Ask the fabricator to show which depth its evidence represents and to identify the entry face. A measurement recorded from the opposite face can otherwise appear to refer to the same location.
A contrasting example comes from Infineon's HybridPACK Drive assembly instructions. For the module covered, the documentation illustrates using a distinctive 1.06 mm design-file identifier to flag the press-fit locations, then explicitly directs the fabricator to a table and shows a 1.15 mm drill tool. These numbers perform different jobs. This is a module example of drawing communication, not a pair of requirements for an HD Express connector. If you receive a CAM query asking which drill to use, find the controlling document before giving the shop the number appearing beside the hole in an interchange file.
When the connector is not yet selected, ask for two preliminary prices only if the requested scope is clear. One might cover the quoted board as drawn. The other might include a revised press-fit hole definition subject to release of the connector drawing. Put the conditional item on the face of the quotation and decide who will revise the fabrication package. A low unconditional price based on an ordinary via process and a later charge to remake boards is a poor basis for comparing vendors.
Make the drawing usable at the board shop
A drawing package usually reaches the shop through manufacturing data generated from a design file. During that transfer, a design note attached to an individual hole can disappear from the information used on the floor. Ask the shop to return a short marked-up plot showing the locations it interprets as press-fit. Include the part reference designator and a coordinate or illustrated landmark for at least one hole. A generic statement that press-fit holes are “covered” will not reveal a board variant whose footprint inherited an obsolete symbol.
If a plated hole appears in more than one component pattern, ask how the requirements follow its intended use. The same final size can appear as a via in one region and a press-in hole in another. Merging them into one tool group may or may not be acceptable. Have the board shop compare the applicable process, finished diameter, wall plating and positional requirements before it decides. A buyer can request the comparison without dictating the shop's CAM method or promising that the two groups will need different tools.
Present the interface in a small table that can travel with a request for quotation. Fill the requirement cells from controlled documents. Leave the supplier response cells empty. Send a separate line for each distinctly specified hole family. This lets the board shop identify a genuine exception without having to reject the entire board order.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Item to confirm | Drawing owner supplies | Fabricator or assembler returns |
|---|---|---|
| Pin and hole identity | Ordered header, footprint revision, insertion face and marked hole group | Corresponding fabrication and assembly references |
| Barrel construction | Required drill, wall copper, finish and finished range where specified | Interpretation of required values, measurement locations and proposed evidence |
| Engagement depth | Section showing board thickness, working zone and seating reference | Confirmation of stack and any excluded depth or back drill |
| Installed result | Agreed seated condition and disposition for anomalies | Sample record with tool identity, location and inspection result |
Keep the table aligned with the drawing numbering. If a result is sent against “hole 14,” the reviewer needs to know whether that means pin fourteen on the connector, a plot symbol, or a sample number on a section report. A simple convention such as the printed reference designator followed by the connector position can remove that ambiguity. If the fabricator uses different references internally, retain its mapping rather than requiring it to rename every feature on the shop floor.
Ask how the shop will distinguish two boards with the same measured opening
Imagine two entirely hypothetical bores measured at 1.00 mm after finishing. In an idealized circular section a bore initially measuring 1.10 mm with uniform total buildup of 0.05 mm per wall finishes at 1.00 mm. A second starts at 1.06 mm and receives 0.03 mm per wall. Its finished diameter is also 1.00 mm. The arithmetic subtracts the buildup twice, once for each side. These invented values demonstrate a distinction and give no specification for a connector, board, finish or inspection tool.
If the governing application drawing controls wall copper as well as finished diameter, those identical gauge results cannot establish that both boards meet it. Total buildup also does not disclose how much is copper and how much is another finish. Ask what information identifies the tool used, what evidence covers the wall construction and what measurement checks the finished opening. The board fabricator may use different records for the three questions. Requiring all answers to appear on a single gauge ticket can encourage an attractive but incomplete certificate.
Consider the interpretation when a purchaser asks for a “cross-section.” Which board or witness coupon does it come from? Were the relevant holes included on the coupon and processed on the same build? Which orientation and location are visible, and do they cover the controlled working zone? Ask for an annotated view with dimensional units and feature identities that can be compared to the drawing. A large clear micrograph of an unidentified via cannot establish the construction of the header's holes.
A section consumes material, so align the sampling and ownership of sacrificial boards before the quote is signed. The board shop may offer a process coupon while the assembler expects a section through an actual installed pin. One looks at the as-fabricated barrel, the other may show the interface after pressing. Identify the decision that needs evidence and price the appropriate sample. Where a coupon is proposed, have engineering accept how it represents the actual part. Sampling can then be deliberate instead of becoming an emergency request after the first completed assembly has shipped.
If the product combines an installed connector and a mating harness in one delivery, the OEM and ODM sourcing page can help define what belongs to the quotation. Send the connector drawing, finished-board requirements and intended press-in scope with the sample quantity and the records needed for release. That gives each responding supplier an opportunity to state whether it is pricing a component, board fabrication, installation, inspection or some combination.
Separate installation control from incoming board inspection
A report on the loose board can support release to assembly. Installation creates a new state. Ask how the assembler indexes the right connector and board, where it supports the PCB and which surfaces the upper tool is designed to load. Supply drawings of adjacent components if they are already present when the connector is pressed. A board support designed for an unpopulated sample may touch a component on a populated production board. The assembler should identify that conflict before the first loaded board arrives.
A force reading needs a defined context. A machine reading for a complete row of pins combines their contributions and any interference or friction elsewhere in the operation. The input to the press may include a guide feature as well as the compliant contacts. Dividing the total by the number of contacts does not determine what happened at one damaged pin. Request the approved installation limits for the actual product and tool, the observation made during placement and any independent check of final seating. Applying an invented force limit to an otherwise documented process adds uncertainty.
When equipment can record a force versus travel trace, decide which event starts the record and how the travel reference is established. Ask the supplier to label a representative file with connector position count, board revision, tool identifier and approved comparison method. If the contract only requires an end-of-stroke result, avoid paying for an archive of traces nobody will interpret. If engineering needs a trace when a part seats unevenly, specify how it will be retained and matched to the affected assembly. Agree those choices while the records still exist.
After pressing, inspect the seating reference that the component drawing actually defines. A raised molded rib may be intentional. A gap visible at one corner can be meaningful even when the opposite corner looks normal. Ask how the assembler will distinguish the specified gap or standoff from a connector tilted during insertion. Where the housing obscures the joints, record what can be observed directly and what depends on inspection of a sample, process evidence or further testing. A close-up image proves only what is visible within its field.
Use a first article to decide what the repeat lot will need
Start the first article with the unassembled identities. Record the board lot, component lot, finish option and the controlled versions of the board file and connector application document. Photograph or otherwise identify the marked samples before installation. Once the connector is fitted, a finished hole may no longer be accessible for routine dimensional inspection. Checking identities while the parts can still be separated gives the team a way to relate the board supplier's report to the assembler's result.
Divide the first-article decision into things that can be released separately. A correctly made pattern may allow purchase of additional bare boards even if the press fixture needs adjustment. Conversely, a connector may be acceptable against its own drawing while a board lot awaits evidence about wall plating. Give each hold a named boundary. Quarantining an unrelated mating harness because a particular board coupon is missing can consume schedule without telling anyone what to correct.
Two bids can differ mainly in who accepts that interface risk. In a hypothetical comparison the first bidder will deliver loose boards with a certificate for finished dimensions. The second will install supplied headers and provide traceable material identities, one board construction record and a seating inspection. Compare the common bare-board price first. Then list the evidence, installation work, spare sample and tooling included by each. The lower bid may be entirely suitable if an existing assembler already owns the tooling and the board record covers the required geometry. It leaves an open specification if neither party accepts the barrel requirement.
Include the repeat order conditions before approving the first sample. Ask which documents will accompany each shipment and which remain available only on request. Agree when a changed PCB fabricator, plating finish, connector manufacturer, board thickness or installation tool calls for another review. A letter saying “no change to function” provides little help if it does not identify a change to the compliant zone or its mating bore. Written identification of changed and unchanged characteristics lets engineering decide how much requalification is proportionate.
Deal with a board that will not accept the connector
Stop the trial before the parts are altered to make them fit. Keep one unpressed board from the same lot if possible and identify the connector that was tried. Record whether all positions resisted, a particular corner stopped, or the housing contacted something outside the hole pattern. That distinction helps identify whether the next step is checking bore construction, pattern position, tool alignment or a mechanical interference. The observation is evidence for an investigation, not a conclusion about the responsible supplier.
Ask the fabricator to present the board data it actually used, including any production clarification accepted after the original RFQ. Ask the connector vendor to identify the drawing revision and footprint supplied with the lot. Ask the assembler to identify the pressing side and support. A layout error can survive a review if everyone compares their documents to the same obsolete illustration. Overlay or cross-reference the part-specific documents in one orientation and include the agreed tolerances, not just the center coordinates.
Treat rework as a new process decision. Drilling out an undersized press-fit hole can remove material that was required to conduct current or support the press-in contact. Removing and reinserting a connector may change the termination or barrel. Have the relevant manufacturers and engineering authority identify whether the proposed replacement or repair is supported for this assembly. Agree the inspection following rework and record the affected serial numbers or lot identities. Sending a replacement header alone cannot repair a board whose specified interface was lost.
For a repeat purchase, request the board, installation and evidence items as separate RFQ lines. Attach the list of exceptions from the first article, the agreed disposition of each, and the drawing revisions now in effect. If the board also uses surface-mount connectors, direct their distinct board-facing inspection to the guide to solder-tail coplanarity. Giving each termination its own acceptance method avoids calling for a plated-hole report on a component that actually sits on solder pads.
Buyer FAQ
Can the PCB supplier choose any drill that produces the right finished hole?
Read the application document for the exact termination. Some manufacturers prescribe a drill or wall construction as well as a finished bore. In that case the fabricator should quote against all applicable requirements and identify any departure. If the drawing genuinely leaves process selection to the fabricator, request the records needed to demonstrate the finished characteristics and have engineering approve how they will be interpreted at receiving.
Is a plug gauge on a bare board sufficient for lot release?
It may support a specified size decision if the gauge, measurement location and acceptance method suit the drawing. It does not identify the copper thickness, prove the finish composition or locate the working section of an installed pin. Decide which characteristics require production records or a section report and which can be checked by the receiver. A small agreed evidence set can be more effective than an unstructured package of photographs.
What if the connector vendor specifies one finish and the drawing lists another?
Flag the disagreement before fabrication and obtain a written technical disposition tied to the exact pin, board and process. A finish substitution can change the interface that was evaluated. Ask which requirement is controlling, who can authorize the alternate and what evidence supports it. Update the board drawing, purchase order or approved deviation as appropriate so suppliers have a consistent instruction when they build repeat lots.
Should the supplier quote a force test for each connector position?
Determine whether the intended evidence relates to a complete assembly, an individual termination or a qualification sample. The manufacturer may specify different methods for different purposes. A total press load from the assembly machine does not isolate the behavior of each contact. Ask who interprets the data and what event places an assembly on hold before agreeing to the reporting frequency or paying for an additional test.
Can we use evidence from a similar board made by the same shop?
Ask which attributes it represents. A prior process study can help evaluate a proposed fabrication method, yet it may concern a different finish, board thickness, hole group or termination. For release of the current lot, preserve the link between its production records and the board revision being installed. The engineering authority should decide where prior evidence is transferable and which changes require a fresh sample.
Does the header's current rating prove that its installed press-in joints are suitable?
The rating belongs to the configuration and conditions defined by its source. Check whether the proposed board, installation and use are represented. A purchasing file may need several kinds of evidence, including component identity, installation acceptance and performance under project conditions. A successful mechanical seating observation does not quantify heating, and a component rating does not identify the wall construction of the board that arrived.
What should the board house, connector supplier and assembler each receive?
Give all three parties the same marked interface drawing. The board house needs the hole definitions, permitted finish, inspection depths and required records. The connector supplier needs the exact termination code, application and proposed board construction. The assembler needs both approved revisions, tool access and a seating or exception rule. Name the person who can resolve a departure before the first order is released.