A connector shock claim is useful only when the reported pulse, duration, directions, repetition and mounting match the decision being made. A larger acceleration number alone does not establish better coverage. Ask for the exact connector pair, fixture arrangement, delivered exposure and acceptance evidence before treating a test summary as a purchasing approval.
For a buyer, the immediate question is often simple: can the proposed connector replace an existing item in equipment that experiences occasional impacts or repeated jolts? The answer requires a controlled comparison. A report can be relevant to the interface yet leave a gap in pulse duration, connector orientation, cable restraint or the number of applied shocks.
This guide explains how to review that evidence and turn gaps into clear quotation conditions. It does not choose test severity, prescribe laboratory operation or approve a connector for a vehicle, machine or safety function. Those decisions belong to the applicable specification, manufacturer and responsible engineering team. It makes no claim about SINAWATTS laboratory facilities, component certifications or stock.
Define the shock question separately from vibration
Write down what event the project is trying to address. Possible descriptions include an operating mechanism reaching a stop, equipment being transferred between fixtures, or an installed assembly experiencing a specified transient. Record whether the connection must remain electrically functional during the event or merely survive in a defined condition afterward.
Do not transform a casual description such as rough handling into a numerical acceleration requirement. The technical owner should identify a governing specification or an approved environmental definition. The purchasing role is to make sure the supplier responds to that definition, with assumptions visible, instead of substituting a familiar test from a different product family.
A vibration result addresses its own excitation and duration. It does not automatically answer a discrete-shock requirement. Use the existing connector vibration and discontinuity guide when vibration is also required, but keep the two exposure records separate. A combined report may contain both; a combined heading is not proof that both were completed under the required conditions.
The IEC 60068-2-27:2008 official scope covers specified non-repetitive and repetitive shocks, including the possibility of accumulated degradation. It describes prescribed pulse shapes and specimens mounted to a fixture or test machine. This supports asking about both the pulse and the repeated sequence. The public scope does not provide a universal severity for every connector application.
Identify the method without borrowing missing requirements
The IEC 60512-6-3:2002 official publication identifies a connector shock test method for specified severities. Record the complete method and edition used by the supplier. Then identify the product or project specification that supplies the required severity and acceptance criteria.
A standards number on a certificate is not a substitute for those fields. Two reports may refer to a related method while applying different durations, directions, sample arrangements or acceptance rules. The review should explain what is shared and what differs; it should not collapse the differences into a single compliance tick.
If a report uses a manufacturer procedure or an older method reference, ask for the controlled procedure identity and the technical assessment connecting it to the current requirement. An older report is not automatically invalid, and a newer date is not automatically sufficient. The offered construction and the relevant method details must still be traceable.
Keep access boundaries honest. An official abstract can confirm the publication's purpose and edition. It cannot establish that a particular test followed every clause of the full document. Ask the report owner or qualified reviewer to resolve missing procedural details rather than filling them in from a marketing summary.
Freeze the connector pair and installed configuration
Record both mating part numbers, their revisions, contact arrangement and any optional locking hardware. Include the terminal, wire and seal configuration when the specimen is a cable assembly. For a board connector, identify the board stack, supports and relevant mounting arrangement. Avoid transferring a family-level result to an unlisted variant without an explicit coverage statement.
Photographs should support a drawing or configuration list. A photograph can show that a cable was restrained, but it may not establish the restraint distance, clamp identity or fastener condition. Ask for enough information to reproduce the load path as a documented arrangement, without pretending the buyer must reconstruct the entire laboratory setup.
A connector held by a rigid support is a different test specimen from an assembly that permits a cable or board to move with it. The question is whether the proposed installed arrangement is covered, not whether one support strategy is universally better. Have the technical owner identify differences that require additional evaluation.
Check that the locking features used in the test will actually be supplied and installed. A report with an optional retention screw does not directly cover a purchase order that omits it. Link the item identity to the connector retention and secondary-lock guide when the quotation includes separate terminal and housing retention decisions.
Read the complete pulse definition
Peak acceleration is one field in the exposure definition. Also capture pulse shape, duration, polarity or direction, tolerances under the applicable method, and the delivered waveform evidence. The purpose is to compare like with like, not to rank quotations by the largest number in a table.
A half-sine pulse with one duration should not be declared equivalent to a shorter pulse merely because both share the same peak acceleration. Similarly, a higher peak with a different duration does not automatically envelop the required exposure. Ask the technical reviewer to approve any substitution on a documented basis.
The report should distinguish the requested target from the actual delivered exposure. A test plan gives the intended condition. A completed report should show what was applied and whether it met the method's permitted envelope. If only nominal settings are supplied, record the missing validation evidence rather than silently treating the setting as a measurement.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Exposure field | Information needed for comparison | Gap that should remain visible |
|---|---|---|
| Pulse shape | Named waveform and applicable method | Shape omitted or described only as impact |
| Peak acceleration | Target, delivered result and units | Headline value without measured evidence |
| Duration | Defined duration and its interpretation | A shorter pulse assumed to cover a longer one |
| Directions | Physical mapping of positive and negative directions | Three axes listed without directional detail |
| Repetition | Required and valid shocks for every direction | A total with uneven or unidentified allocation |
| Mounting | Fixture, support and connector orientation | Different load path with no coverage assessment |
The table is a document review tool. It is not a new acceptance standard. A qualified laboratory and the project technical owner must select the actual method, limits and evidence needed for the intended application.
Convert axes into an auditable direction count
Ask how the connector's physical coordinate system maps to the test machine. An axis label by itself can be ambiguous if one drawing defines the mating direction as X and another calls it Z. Include a diagram or photograph with the orientation identified and make sure the report uses the same convention.
When both positive and negative directions are required on three axes, there are six directions to account for. If the agreed plan requires three valid shocks in each direction, the planned total is eighteen. This is simple bookkeeping for that stated plan, not a default requirement imposed on all connectors.
Record the completed count by direction and specimen group. A total of eighteen is insufficient if one direction received six shocks and another received none. Likewise, counts from different specimens should not be added together to imply that each individual specimen completed a full sequence unless the governing plan expressly defines that allocation.
A practical ledger can use one line per specimen group and direction: specimen IDs; fixture revision; physical direction; planned valid count; completed valid count; waveform record IDs; deviation reference; acceptance owner. In the hypothetical eighteen-shock plan, six lines make an omitted negative direction visible without requiring the buyer to interpret an entire waveform archive. Add the report page or attachment that supports each completed count. Keep a blank evidence field visibly unresolved rather than marking the row complete from the total alone.
Keep preliminary setup pulses separate from the qualifying sequence. Ask how conditioning pulses, invalid exposures and any replacement specimens are identified. Their treatment must follow the approved procedure. The buyer should not decide afterward that every impact either counts or does not count solely to make the report total match the purchase requirement.
Distinguish a single-event claim from repeated-shock coverage
Repetition is a separate part of the question. A connector that completed one specified event has not thereby demonstrated the same evidence as a specimen that completed a defined repeated sequence. Do not convert a repeated sequence into years of service unless an appropriately supported model and application assessment establish that relationship.
Ask whether the same specimens experienced every shock in the sequence and whether their condition was checked between stages. Preserve the order of exposure and examination. Replacing a damaged specimen or re-tightening a fixture component can change what the final record demonstrates; it must be explained rather than hidden in a concluding pass statement.
For an RFQ, require suppliers to distinguish existing evidence from proposed additional work. A supplier may have an applicable single-sequence report and offer a supplementary repeated-shock evaluation. That is a reviewable proposal when its scope, dependencies and acceptance owner are clear. It is not equivalent to an already completed result.
Commercial comparisons should preserve those distinctions. Compare the offered connector, mandatory hardware, documentation and any agreed validation service as separate items. Do not invent a price premium or lead-time impact for a more extensive test. Request an actual quotation after the scope is sufficiently defined.
Use a real manufacturer report as an evidence-reading example
Samtec's public SEAM/SEAF severe-environment report, revision 1 identifies the tested connector configurations and gives a mechanical-shock condition of 40 G, 11 milliseconds, half-sine, with three shocks per direction across three axes, eighteen total. These are conditions in that particular report, not a universal requirement or a SINAWATTS product rating.
The document also records a separate vibration condition and describes event detection and low-level contact-resistance evaluation. Its value for a buyer is the link between an identified specimen, a named exposure and reported outcomes. A supplier should provide equivalent traceability for the item being offered rather than borrowing the result for another connector series.
This report also demonstrates why condition labels deserve review: page 9 names OS2, while the page 19 event-detection summary names Condition F beside the same 40 G, 11 ms half-sine description. Ask the report owner to reconcile those labels before relying on a classification claim; the matching numerical description alone does not resolve every procedural detail.
For more detail on post-exposure electrical measurements, use the low-level contact-resistance guide. A shock review should point to the required electrical criteria without replacing the measurement specification with a generic statement that continuity was satisfactory.
Separate exposure validity from connector acceptance
An exposure can be delivered correctly while the product fails its acceptance criteria. Conversely, an apparently undamaged product does not validate a shock run whose delivered waveform or mounting arrangement was not acceptable. Keep these as two different review decisions.
For exposure validity, request the report's assessment against the applicable method, the measured pulse records or their traceable summary, and any deviations. For product acceptance, request the specified observations and measurements, their limits, individual results and the disposition of exceptions.
If operation during shock matters, the plan must define the electrical monitoring requirement. A resistance measurement before and after the event cannot by itself exclude a brief interruption during the event. If only post-event functionality is required, do not invent a nanosecond monitoring requirement simply because another manufacturer's report includes one.
The report should make the detection capability and monitored circuits clear when dynamic monitoring is used. Avoid translating a stated detection threshold into proof that no event of any duration occurred. The conclusion is bounded by the actual monitoring setup, selected circuits and report's acceptance criteria.
Worked comparison: reconcile eighteen planned shocks
The following example is hypothetical. It demonstrates evidence review and arithmetic only; the values are not recommended connector limits, product test data or a customer case. Assume the project owner has already approved an eighteen-shock plan: three valid shocks in each of six directions, with a specified pulse and a fixed mounting drawing.
Offer A reports eighteen nominal shocks but supplies no direction ledger. Offer B supplies sixteen valid shocks: three each in five directions and one in the sixth. Offer C documents all eighteen required shocks, but its specimen uses an additional mounting bracket absent from the proposed assembly. No offer is automatically ready for release from these summaries alone.
On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.
| Hypothetical offer | Evidence supplied | Coverage gap | Appropriate next step |
|---|---|---|---|
| A | Eighteen total, matching nominal pulse | Direction allocation and actual pulse validity not shown | Request the completed ledger and validity record |
| B | Five directions with three valid shocks; sixth with one | Two required valid shocks unaccounted for | Ask the technical owner to approve a completion or replacement plan |
| C | Eighteen valid shocks in six directions | Additional bracket changes the offered configuration | Obtain a coverage assessment or matching-configuration evidence |
For Offer B, five multiplied by three plus one equals sixteen. The missing two belong to a particular direction; they cannot be replaced on paper by extra shocks applied elsewhere. Nor should a buyer instruct a laboratory simply to continue testing without considering the existing specimen history and the governing method.
The release record should state the unresolved question precisely. For example: hold the shock-qualification acceptance for assembly revision R until the approved reviewer accepts the missing-direction disposition and the resulting report. Separate that hold from other completed checks such as part-number verification or packaging inspection.
This approach avoids a false binary choice between rejecting every incomplete report and accepting an unsupported summary. A supplier can close a defined gap with appropriate evidence. The scope of the hold, the party responsible and the evidence required are all visible before the purchasing decision is finalized.
Read damage and functional results at the right level
Ask which items were examined for housing cracks, latch damage, contact movement, fastener condition or other specified effects. The required observations depend on the connector and governing specification. Do not assume that a photograph of the outside demonstrates the condition of every internal feature.
Keep results associated with specimen identifiers. If several assemblies are tested, a group-level statement should be supported by the required individual findings. A single acceptable final measurement should not conceal a failed specimen, a disconnected channel or a replacement made during the sequence.
Record whether disassembly was part of the planned final examination. Opening a connector can reveal information, but it can also change its condition. The reviewer should know which measurements were taken before disassembly, which were taken afterward, and whether the report distinguishes those stages.
A report may contain permitted deviations or qualified conclusions. Carry those qualifications into the purchasing record. Do not shorten a statement such as acceptable under the documented fixture condition into an unrestricted shock-resistant product claim on the drawing or purchase order.
Keep shipment evidence separate from installed performance
The shock exposure of a packaged shipment is not necessarily the exposure at an installed connector interface. A shipping package can form part of a test specimen, while the installed assembly has a different support and load path. Ask what the report actually evaluated before using it to close either requirement.
If the procurement scope includes both transport survival and installed operation, use separate evidence rows. One can address packaging, handling orientation and shipment acceptance. The other can address the connector pair, mounting, cable support and operating-state requirements.
Incoming inspection should verify that the delivered product matches the approved identity and configuration. It normally cannot recreate a qualification program merely through visual inspection. Define what shipment records, part markings, configuration checks and damage observations are required, without treating receipt inspection as a replacement for missing qualification evidence.
For a broader assembly quotation, the custom cable assembly RFQ checklist can help organize drawing and sample requirements. Keep shock evidence as one controlled attachment, with a clear relationship to the complete assembly rather than an isolated certificate.
Control substitutions and later drawing changes
A purchasing approval should identify which changes trigger technical review. Examples include a different housing revision, contact arrangement, locking accessory, cable construction, board support or mounting bracket. The manufacturer should explain whether existing evidence covers the change or further verification is needed.
Do not automatically demand a complete retest for every administrative revision. Instead, require a documented classification of the change and its effect on the accepted evidence. A drawing-note correction and a different load path are not the same type of event.
Ask how the supplier will notify the buyer before a covered configuration changes in production. The quotation and purchase agreement should identify the evidence expected with an alternative, including the exact replacement part and the proposed disposition of the existing qualification.
When comparing connector product options, keep catalog selection separate from final application approval. Provide the selected part or interface drawing and ask the supplier to state what supporting evidence is available. Send RFQ with the pulse definition, mounting drawing and unresolved coverage questions so the response can address a concrete purchasing decision.
Buyer FAQ
Is a higher shock acceleration always better evidence?
No. Peak acceleration must be read with pulse shape, duration, directions, repetition, fixture arrangement and acceptance criteria. A higher peak in a different test does not automatically cover the required exposure. Ask the responsible engineer to assess equivalence rather than ranking offers by one number.
Does a vibration qualification also prove shock resistance?
Not by itself. The report must identify the shock exposure and its results separately. A combined mechanical test program can include both, but the presence of a vibration result cannot fill an absent shock record or missing direction count.
Can a report for another connector size be accepted?
Only with an adequate coverage assessment for the offered construction. Ask which features are shared, which differ and who approves the applicability. A common family name or visually similar housing does not establish that every arrangement experienced equivalent mechanical conditions.
Must the connector be electrically monitored during shock?
That depends on the agreed requirement. If uninterrupted operation matters, define the monitored circuits, detection capability and acceptance rule before testing. If the requirement concerns post-event integrity, use the applicable specified measurements. Do not assume either approach from the word passed.
Can missing shocks simply be added afterward?
The technical owner and laboratory must decide how to address the gap under the governing procedure and specimen history. The purchasing record should identify the missing direction or count and preserve the original report. Additional work must be documented, not silently inserted into the original total.
Does an old report require a new test for every order?
Not automatically. Review the specimen identity, applicable method, construction changes and coverage of the current requirement. A controlled, relevant report can remain useful. Request updated evidence when the basis for relying on it has changed, rather than using age alone as the decision rule.
How should qualification costs and timing be compared?
Ask suppliers to separate existing documentation from proposed evaluation work, including samples, fixture needs, report deliverables and dependencies. Obtain actual commercial terms for the defined scope. This guide does not assume test capacity, fixed prices, minimum order quantities or completion times.
Prepare a shock-evidence inquiry that can be answered
Send the exact mating pair, revision, contact population and required accessories. Attach the mounting and cable-support drawing, the governing shock definition, direction count and operating-state requirement. Include any existing report with the relevant pages identified and list the specific gaps that prevent release.
Ask for a response that separates demonstrated coverage, proposed supplementary evidence and exclusions. Require the offered configuration to remain traceable through sample approval and shipment. That makes the quotation usable even when some technical questions need to be resolved before an order can be released.