Technical Buyer Guide

CTI vs PTI for Connector Housings: Which Evidence Should a Buyer Accept?

Review a connector housing CTI claim, read material-group boundaries and specify a PTI acceptance check. Compare evidence for an original part and a substitute.

Published by SINAWATTS · Last reviewed 11 November 2026 · Editorial and source policy

Ask for comparative tracking index (CTI) evidence when choosing a housing material. Ask for proof tracking index (PTI) evidence when an agreed acceptance plan calls for proof at a specified level. Before signing either decision, match the evidence to the insulating piece and ordering code in the quotation. A number printed next to a material name can answer the first question while leaving the purchase decision open.

Consider a buyer comparing two plugs. Both fit the drawing, and one supplier highlights “600” beside the words “tracking resistance.” The other encloses a controlled part sheet and asks which material group the application needs. The second supplier has asked a useful question. Until the engineer identifies the insulation path and required evidence, the buyer cannot tell whether either offer closes the requirement. The fastest way forward is to give each bidder the same part boundary and ask for the missing document by name.

Identify the piece that separates the conductors

Start with a marked view of the assembly. Locate the two conductive features whose separation is under review. Trace the relevant insulating surface on the drawing with the design owner and give that view a reference. On a connector with a plug insert, a header body, a shroud and a rear seal, “connector plastic” could mean several different things. A supplier can truthfully provide a brochure for the outer shell while leaving the insert between adjacent contacts unidentified.

Give the part a name that a person receiving the shipment can recognize. Include the manufacturer's ordering code and suffix, drawing revision, color if it forms part of the code, and whether the plug is supplied alone or mated to a specified header. If several pieces contribute to the path, ask the designer which ones must appear in the approval record. Mark unassessed pieces individually. This prevents an approval for a plug insert from silently becoming an approval for the corresponding receptacle.

For example, an overmolded cable assembly might arrive under a harness manufacturer's number. That number can remain fixed even when a connector option changes under an agreed supplier configuration. Ask the assembler to identify the actual connector and controlled variant behind the harness number, or to provide a signed cross-reference under the project's confidentiality arrangements. A photograph helps locate the insert. The document linking the shipped configuration to its evidence makes the photograph usable at the next order.

The answer may also narrow the work. If the path reviewed by the equipment engineer lies entirely within a separately purchased terminal block, the buyer can direct the material request to its manufacturer. Log the decision on the assembly drawing and send other vendors the assembly requirements they own. This keeps a harness assembler from spending time collecting tracking data for an unrelated strain-relief sleeve.

Read CTI and PTI against the purchasing decision

Tracking concerns the development of a conductive path along an insulating surface. The public scope of IEC 60112 describes an alternating-voltage method for specimens made as plaques or taken from equipment parts. It identifies both material composition and surface condition as influences on the outcome. It describes CTI as a way to characterize and compare materials, and PTI as useful for acceptance and quality control. The scope also says that the result alone cannot establish a safe creepage distance for an apparatus. IEC 60112:2025, corrected version

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Decision being madeEvidence to ask forQuestion the reviewer can close
Select a housing materialCTI declaration or report tied to the candidate material or partDoes the selected configuration support the material assumption on the drawing?
Accept an agreed proof checkPTI record identifying the specified level, specimen and represented productionDid the agreed sample satisfy this purchase requirement?
Approve an installed connectorProduct-specific ratings and an assembly insulation reviewDoes the connector suit the named operating conditions in this equipment?

A purchasing specification can legitimately require more than one of these records. For a catalog connector with a product sheet naming the housing and its group, the equipment reviewer may accept the manufacturer's declaration for material selection. If the same contract also requires periodic proof checks on parts from production, the product sheet does not tell the receiving team which production population was sampled. Name the two deliverables separately so the supplier can price and schedule the actual work.

A successful proof check at the agreed level has a corresponding limit. The result supports the specified acceptance decision for the population covered by the quality plan. Entering that level as a new measured CTI in the approved-materials list changes the meaning of the report. Preserve the test designation as issued. When a supplier describes an entry only as “tracking passed,” ask what decision was tested, at what level and on what specimen before adding a number to a drawing.

Watch the edition as well. The IEC publication checked on November 11, 2026 identifies its corrected version dated February 2026. IEC also publishes the correction separately. Record the basis requested by the project and the basis stated in the submission. If an existing equipment approval cites an earlier edition, ask its owner for a documented applicability decision before issuing a blanket retest order. An edition change is a reason for review, and the affected detail determines what further work is necessary. IEC corrigendum for IEC 60112:2025

Read a manufacturer's connector sheet in two passes

Open the manufacturer sheet for Phoenix Contact item 1809611, an identified PCB connector. In the housing section, the sheet names green PA, insulating material group I and CTI 600. The same section also records flammability and glow-wire properties as separate entries. The scope of the CTI statement is readily visible because the sheet identifies both the housing and the article number. This is a real example of document reading. It makes no statement about the material used by SINAWATTS or in a competing connector. Phoenix Contact item 1809611, pages 2–3

Now turn to the electrical test section for that same article. Its rated insulation voltage is 320 V in the rows labeled III/2 and III/3, and 630 V in the row labeled II/2. The material entry remains CTI 600. A worksheet that copied “600” into its operating-voltage field would miss the manufacturer's actual ratings in all three rows. Copy the complete applicable row with its conditions, document ID and page, and have the equipment engineer confirm which row applies.

Take particular care when comparing two drawings with the same pitch. Pitch identifies the spacing of repeating features along the connector. The actual surface path may follow the profile of the insulating body, and the assembled installation defines which conductive features matter. A pitch entry is convenient for finding a mating family. Treat the drawing and application review as the evidence for a spacing decision. The enclosure creepage and clearance guide covers how to record the geometry and environment for that separate review.

Use the two-pass approach when a distributor supplies a screenshot. First locate the material line and its part identity. Then locate the operating rating and its conditions in the manufacturer's current document. If the screenshot captures the values while cropping the units, conditions or ordering code, send back the fields that need restoring. Two reviewers can then check the conclusion without relying on the person who took the screenshot.

Resolve material-group boundaries without guessing precision

In its industrial connector catalog HARTING presents the following grouping of CTI values. Read this as a reference for interpreting the group terminology found on bids. Check that the equipment requirements actually use the same grouping before entering it as a contract condition. The catalog also explains the roles of insulating material, voltage and pollution degree in creepage selection. HARTING industrial connector catalog, technical information

On small screens, swipe or scroll sideways to read every column. Keyboard users can focus the table and use the arrow keys.

Group in the catalogCTI interval
I600 or higher
II400 to below 600
IIIa175 to below 400
IIIb100 to below 175

A statement of group II leaves room for several values within its interval. If the project requires at least 400 using this scheme, a controlled group II declaration can answer the numerical classification question, subject to the accepted evidence format and the identity check. Suppose instead a hypothetical drawing explicitly requires CTI of at least 550. A group II declaration alone leaves both a value below 550 and a value at or above 550 possible. Keep that line open even though the bidder correctly named the group. Ask for a declaration or report at the resolution the drawing needs.

Another common ambiguity comes from spreadsheet formatting. A source may report a range or an inequality. Transcribe it exactly. Converting a lower bound into equality makes a measurement appear more precise than the manufacturer advertised. Converting a value just below a boundary into a rounded category entry can change its group. Give the spreadsheet separate cells for the stated value or range, the claimed group and the document source. Allow text in the value field so no one has to discard the qualifier to save the file.

Group I is written as an inequality in the catalog. IEC 60112 describes a method with a test voltage up to 600 V AC. If a worksheet shows a higher number followed by “per IEC 60112,” ask the issuer which quantity, method and unit it actually reported. A group label alone supplies no measured value beyond the range of the stated method.

The output at this stage is a material-group decision for an identified configuration. Give it back to the engineer alongside the drawing. If the board layout, housing ribs, mating condition or enclosure environment changes, the design owner can revisit the path using the recorded assumption. The purchasing file should show who owns that calculation rather than leaving a reviewer to reconstruct it from a material number after tooling has been ordered.

Connect the test specimen to the ordered housing

Read the subject line of the submitted record before its result column. A material maker can characterize a named resin grade on plaques. A connector manufacturer can give a housing-specific declaration. A testing laboratory can report what happened to specimens identified by its client. These records describe different objects. A useful approval file states what the object was and who can link it to the connector being purchased.

For a resin document, ask for the exact grade designation, any color or formulation coverage stated by its issuer, and the document revision. Then obtain a controlled statement from the part maker linking that grade and relevant variant to the housing. A broad description such as nylon or engineering thermoplastic leaves the grade open. A list of approved grades also leaves the shipped configuration open if it contains alternatives with different evidence. Ask which option is quoted and how a later substitution would be communicated.

For a part-derived specimen, ask which part, surface and revision it represents. A sketch or annotated photograph can convey this faster than a long report covering several products. Where preparation altered the surface or the submitted piece came from a related housing, have the qualified reviewer assess whether the result answers the specified question. The method's stated sensitivity to surface condition makes the origin and preparation worth recording. Procurement can request the identification without prescribing laboratory work from a public summary.

A bidder may reasonably protect its formulation, tool drawings or full test report. Give it a practical disclosure route. For example, your reviewer might accept a signed declaration that names the orderable housing, applicable method, value or group, controlling report reference and scope of covered variants. The buyer can receive the conclusion and the approval holder can review restricted details under an agreement. If the contract requires the underlying report, obtain the buyer's written acceptance of any alternate route before letting that route become a condition of supply.

At the end of the review, file the relationship in a single sentence someone else can check. For example, “Housing code from line two of the offer is covered by the issuer's declaration in appendix B; the covered suffixes appear in table two.” This is an illustration of how to document a link, not proof for any commercial part. A colleague should be able to start with the order and reach the same declaration after the sales contact changes.

Compare three bids for the same connector insert

Assume a hypothetical equipment owner has specified a minimum of group II or better using the HARTING intervals above. The controlled drawing identifies a removable plug insert in one color. The project accepts a part-specific manufacturer declaration for initial material selection. It also requires a separately agreed PTI acceptance record for the preproduction sample. The example gives no test results, actual prices or endorsements. Its purpose is to show how three credible-looking bids close different parts of the purchase.

Bid A supplies a part page with CTI 600. The ordering code on that page is for the standard color. The proposed offer names another color suffix. The buyer has enough information to identify a potential group I candidate if coverage is established. Ask the issuer for the specific alternate page or written inclusion of that suffix. Keep the production approval open and request the preproduction proof plan separately. A high number for the wrong suffix does not establish the offered variant's group.

Bid B supplies a group II declaration identifying the exact insert and color. The declaration carries an issuer, date and revision and the drawing permits this type of evidence. That meets the hypothetical material-selection condition without requiring an exact CTI value within the interval. The sample documentation still contains only a packing list. Allow the defined engineering sample decision if project procedure permits, and put the agreed proof record on the preproduction release list with an owner and due event.

Bid C supplies a proof record for pieces identified to the sample lot. The scope and test level match the agreed proof check. There is no material-group declaration for the ordered insert. Credit the proof deliverable if the quality owner accepts its traceability. Ask the part maker for the missing classification before closing the material-selection line. This avoids paying for a repeat of a test that already answered a different question.

For the award meeting, show two cells for each bid: material selection and sample acceptance. Place the outstanding action in the cell that remains open. If one supplier can close the evidence gap before tool release, compare the revised offer against the same milestones used for the others. If a late change would require a different mating half or a new approval, have engineering estimate that work separately. This turns a vague purchasing risk into a specific dependency with a decision owner.

For a replacement inquiry, send the quoted insert code, color suffix and the evidence still missing. Ask the supplier to identify which release decision its reply supports.

A quick award note can fit in three lines:

  • Bid A: ask for the alternate suffix declaration before releasing the insert. Both acceptance cells are open.
  • Bid B: record the material selection as accepted under this example's rules. Release the preproduction lot only when its proof record has been accepted.
  • Bid C: keep the accepted proof record tied to the sample population. Hold the material selection until the group evidence is accepted.

For example, write into a comparison sheet: “Line B, insert revision on drawing. Manufacturer declaration received for the quoted suffix. Proof record due before authorizing preproduction release. Quality engineer owns that open decision.” This keeps the unfinished task visible when a colleague places the order. If the customer only asked for material selection, remove the invented proof milestone from the example when adapting it.

Write a proof-check requirement suppliers can quote

A useful proof-check request starts with the approved drawing and a decision event. Examples of events include first delivery after a named material change or acceptance of a specified preproduction lot. Ask the project quality engineer to define whether proof evidence is required at that event. A PTI reference on an old purchase order is not enough to establish a continuing requirement for every shipment. Copying it without the sampling and acceptance terms makes bidders price very different obligations.

Include the method and edition, proof level chosen by the authorized project owner, specimen origin, coverage of colors or variants, and the acceptance and reporting reference. Identify who selects and marks samples and how their identity remains linked to the lot. If an independent laboratory is required, state the contractual requirement and verify the proposed scope. If manufacturer records are allowed, give bidders the same instructions. Exact test execution and acceptance criteria belong with the competent laboratory and the controlled standard.

Specify what to do when the result is missing or disagrees with the approved requirement. The receiving team needs an affected lot identifier, a hold location or system status, and a route to the reviewer empowered to dispose of the material. If retesting is allowed, the plan should state who authorizes it and what material it represents. Preserve the original record with any later decision. Otherwise a more recent passing document can obscure which purchase order or lot was actually held.

Split the commercial response into already available records, documents obtainable after part selection, and any work that depends on a representative production sample. Ask suppliers to quote additional documentation or testing separately, together with assumptions about sample supply and approval dependencies. This lets a buyer compare the cost of evidence without assuming a laboratory turnaround, an order minimum or a fixed price. Any commitment needs to appear in the written offer for the actual project.

Control changes after the first purchase

Set the approved configuration at the moment a purchase is released. Store the part code, applicable revisions, evidence identifiers, acceptance event and disposition together with the buying record. A receiving inspector can then use the box or delivery paperwork to locate the corresponding approval rather than search a folder of reports by resin name. Define which markings or lot identifiers the supplier will actually provide before making them mandatory receiving checks.

If a supplier proposes a new material source, color package or molding change, request a description of what changes and what stays within the existing evidence coverage. The change owner should identify the affected product codes, first potentially affected lot or date, and outstanding orders. A commercial statement that a replacement has the same fit is useful for a mechanical comparison. Ask the material evidence owner for the tracking comparison and the equipment owner for the application decision.

A change solely to an outer package label may require only a cross-reference so receiving can still identify approved material. By contrast, the same housing name paired with a new resin designation can break the trace from the original report. Keep legacy stock identified separately until the reviewer states which lots are covered. A single PO may need two controlled release decisions if it spans the change boundary. Record both instead of overwriting the earlier approval with the new number.

When the connector sits inside a larger custom assembly, carry the decision to the assembler's bill of materials. On a solar project, the solar power connector category provides a starting point for a part inquiry. Give the supplier the intended mating arrangement and governing equipment requirements so it can respond for the actual configuration. A tracking result alone cannot establish whether unlike PV connector halves may be combined. The PV connector compatibility guide covers the separate mating decision.

Buyer FAQ

Does a connector marked CTI 600 have a 600 V operating rating?

Look up the operating rating for the exact orderable component and the conditions in the application. The CTI value describes the material's performance in a specified tracking test. Phoenix Contact item 1809611 illustrates the distinction with a single housing value and several condition-dependent insulation voltage entries. Keep both fields and their respective source locations when transferring the information into a purchasing record.

Can an agreed proof test replace all CTI documentation?

Ask the design owner which records the project accepts for the material-selection decision. A proof check addresses acceptance at the specified level on the specimens covered by the plan. Keep that result under its reported designation. If the contract asks for a material group as well, request the relevant manufacturer's evidence or obtain a signed disposition permitting another basis.

What if a supplier has only the resin maker's data sheet?

Use the sheet to identify a candidate grade. Ask the housing maker to link the quoted part and variant to the grade and clarify whether the published data cover that variant. Where commercial confidentiality limits disclosure, request a reviewable part-specific declaration or another route accepted by the customer. Supplier traceability and the engineering decision still need an owner.

Is a change of color enough to require a new test?

It is enough to ask what the existing declaration covers. Some documentation may explicitly list the alternative; other records may be limited to the original variant. Request the issuer's scope before ordering work. Let the engineer and quality owner decide whether a declaration, a documented comparison or new testing is needed under the applicable approval plan.

How should a buyer handle a connector with more than one insulating piece?

Mark the relevant surface and its endpoints on the assembly view with the project engineer. Identify each housing, insert or accessory that the engineer includes in that path, then ask for evidence against those identities. A document for one piece can close its portion of the review. Retain open items for the remaining pieces until the equipment owner disposes of them.

Should a laboratory report be requested with every carton?

Define the population represented by the agreed check. A shipment can include several manufacturing lots, or one qualified lot can be split among several deliveries. A lot reference linked to an accepted report may be more informative than duplicate paperwork inside every carton. Have the quality owner define the sampling and record-retention arrangement in the purchase specification.

Which details help a supplier quote a replacement insert?

Send the original and proposed part numbers, marked path, applicable material-group or CTI requirement, evidence already accepted and the approval milestone. Include the mating half and any restrictions on variant or tool changes. Mark documentation gaps expressly. In the reply, request separate descriptions of existing records, proposed additional work and items awaiting the equipment owner's decision.

Request a quote for the identified housing and evidence

Attach the marked drawing, part and mating codes, relevant operating conditions and the document list your reviewer can accept. Indicate whether the decision is candidate selection, a preproduction release or a controlled replacement for an existing order. Include quantity and schedule requirements if available so the supplier can separate hardware pricing from any evidence-related work. Send the housing specification and evidence request to SINAWATTS.